论文部分内容阅读
由山西铝厂和长沙矿冶研究院共同开发研制的熟料窑窑尾CO、O_2气体成份监测装置,经安装调试后,与山西铝厂6~#熟料窑电收尘同步运行,通过近一个月的运行考核证明:该装置完全满足了生产工艺要求。 熟料窑窑尾CO、O_2气体成份监测装置采取水洗过滤方式对样气进行处理,尤其对含尘量高、粘着性强、不易风吹的工况下的样气处理,效果良好,此技术在铝行业尚属首
The monitoring device of CO, O 2 gas components of kiln tail of clinker kiln, jointly developed by Shanxi Aluminum Plant and Changsha Mining and Metallurgy Research Institute, is installed and debugged and operated synchronously with dust collection of 6 ~ # clinker kilns in Shanxi Aluminum Plant. A month’s assessment of the operation proved: The device completely meet the production process requirements. Clinker kiln tail CO, O_2 gas composition monitoring device to take the way of washing filter sample gas treatment, especially for high dust content, strong adhesion, easy to wind sample processing conditions, the effect is good, this technology In the aluminum industry is still the first