论文部分内容阅读
本文通过对泉州500kV变电站自动化系统升级改造为实例,叙述了在超高压变电站中由传统监控模式改造为综合自动化系统的设计原则;同时,介绍了相应的系统结构及功能、具体改造方案和一些现场技术问题的处理方法。
This article through to the Quanzhou 500kV substation automation system transformation transformation as the example, described in the EHV substation from the traditional monitoring mode to the comprehensive automation system design principle; At the same time, introduced the corresponding system structure and the function, the concrete transformation plan and some scene Technical problems approach.