论文部分内容阅读
介绍了太钢新450 m2烧结机配套的715 m2环冷机水平道轨的运行维护情况。针对水平道轨窜动、顶撞曲轨现象,通过分析原因,逐步改进,最终取得了较好效果。
This paper introduces the operation and maintenance of the horizontal rail of 715 m2 circular cooler supporting the new 450 m2 sintering machine in TISCO. Aiming at the phenomenon that the horizontal track and the overhead curved track have been changed, the reasons are improved and the better result is achieved finally.