论文部分内容阅读
爆破开采的石灰岩矿区边坡高陡,岩石破碎,具有严重的崩塌、泥石流地灾隐患。遗留的破损山体如不及时治理易造成环境恶化,常规的方法治理起来费时费力,更是需要大量资金。本文通过对爱康嘉祥山地光伏电站项目破损山体治理项目探讨,针对不同岩、土体工程地质情况提出相应解决方案,在保证质量和工期的同时大大降低了治理费用,并提出废弃地利用的创新思路。
Blast mining limestone mining slope is steep, broken rock, with serious collapse, debris flow hazard. The legacy of broken mountain if not promptly managed to cause environmental degradation, the conventional method of governance time-consuming and laborious, but also requires a lot of money. Based on the discussion of the damaged mountain harness project of Iikang Jiaxiang Mountain Photovoltaic Power Station project, this paper puts forward the corresponding solutions to different rock and soil engineering geology conditions, greatly reduces the management cost while ensuring the quality and duration, and puts forward the innovation of abandoned land utilization Ideas.