论文部分内容阅读
属一级防火重点单位的昆明纺织厂,由于把防火安全工作始终摆在生产经营的重要位置来抓,近几年来,安全防火工作又上一个新台阶.从1991年至今,又连续三年继续保持着“三无”称号(无火灾、无重伤、无死亡),为企业生产经营和内部改革的顺利进行创造了良好条件,昆明纺织厂属劳动密集的国有大型企业,也是一级防火重点单位,现有职工近7000人,年产值约1.5亿元.自92年被省政府列为全省20家自主经营试点单位后,内部改革步伐明显加快.为使企业生产经营能在个安全良好的环境中顺利进行,他们继承和发扬工厂历年来重视防火安全的优良传统,在制度建设上花力气下功夫,形成了一套较为完整的防火安全制度,以及厂级车间轮班的三级防火安全网,按照“谁主管,谁负责”的原则,纳入全厂经济责任制考核,逐月逐层落实到各级领导头上.对防火部位,厂级领导都要汇同各车间、各部门领导定期检查,厂消防队和车间安全员则天天查,这一制度已坚持10多年,很多不安全的隐患正是在坚持不懈的检查中被发现和排除的.去年一年中,全厂共查出火险隐患24条,均及时下达整改意见限期整改,年底已全部整改23处,剩下的一处也正在整改中,整改率为100%.谈及此事,主管防火安全工作的张绍智副书记深有感触地说:“别小看这些琐事,没有小的积累,哪来大的收?
Kunming Textile Factory, a key unit of fire protection, has taken fire safety work to an important place in production and operation. In recent years, fire safety work has reached a new stage. Since 1991, it has continued for three consecutive years Maintained the title of “three noes” (no fire, no serious injury, no death), creating favorable conditions for the smooth progress of the enterprise’s production and operation and internal reform. Kunming Textile Mill is a labor-intensive large state-owned enterprise and a key unit of fire protection , Nearly 7,000 employees, annual output value of about 150 million yuan .92 years since the provincial government as the province’s 20 self-managed pilot units, significantly accelerated the pace of internal reform. In order to make the production and operation of enterprises in a safe and sound Environmental success, they inherit and carry forward the factory over the years attach great importance to fire safety, efforts in institutional construction effort, formed a relatively complete system of fire safety, as well as plant-level workshop shift three fire safety net , In accordance with the “who is in charge, who is responsible for” principle, into the whole plant economic responsibility assessment, month by month implementation of the leadership to all levels of leadership .Fire prevention sites, plant-level leaders should meet The workshop, the departmental leaders to conduct regular inspections, plant fire brigade and workshop safety staff is checked every day, this system has insisted for more than 10 years, many unsafe hidden dangers are in persistent inspection was found and ruled out last year , The whole plant found a total of 24 hidden dangers of fire hazards are issued timely rectification deadline for rectification by the end of all rectification 23, the remaining one is also rectification, rectification rate was 100%. Talking about the matter, in charge of fire prevention Zhang Shaozhi, deputy secretary of safety work said with deep feeling: "Do not underestimate these chores, there is no small accumulation, which big income?