论文部分内容阅读
重庆市辅仁学校学生宿舍工程,施工现场相当狭窄,采用一台庆江“#$%’(型塔吊,塔吊距建筑物最小净距)*,不能安附着,将塔吊安装至标准高度后,吊钩至女儿墙最大净距只有+,-*。本工程正立面女儿墙上有.个半圆形钢筋混凝土装饰拱,断面尺寸为!/”0-’**/+’**,其包边直径#0,
Chongqing Fu Jen Catholic School dormitory project, the construction site is quite narrow, using a Qingjiang “# $%” (tower crane, tower crane from the building minimum clearance) *, can not be attached, the tower crane to the standard height , The maximum distance between the hook and the daughter wall is only +, - *. The facade of the project has a semicircular reinforced concrete decorative arch with the section size of 0 ~ ** / + * *, Its package diameter # 0,