基于新建承德机场沉降量的实测资料,针对西端高边坡的地基沉降问题,采用指数曲线函数模型和双曲线函数模型以及皮尔曲线模型进行了最终沉降量预测。对比分析了不同数学模型的拟合精度,通过对不同模型拟合效果的比较,选取双曲线模型对承德机场工后最终沉降量进行预测,得出新建承德机场西端高边坡测点1-4的最终沉降量为58.24mm。最终沉降量的预测结果对机场后续监测和建设具有指导意义,对机场后续工程起到优化施工和安全预报的作用。 Based on the measured data of the settlement of the newly built Chengde Airport, the ultimate settlement is predicted by the exponential curve function model, the hyperbolic function model and the Peel curve model. Comparing the fitting accuracy of different mathematical models, comparing the fitting effects of different models, selecting the hyperbolic model to predict the final settlement after the completion of Chengde Airport, and concluding that the new high-slope measuring points of Chengde Airport The final settlement is 58.24mm. The prediction of the final settlement will be of guiding significance to the follow-up monitoring and construction of the airport and will play an important role in optimizing the construction and safety forecast of the airport follow-up projects.
其他文献
摘 要: 本文分析了现行高职综合英语教学评价体系存在的问题,从形成性评价体系的理论基础及其在高职英语教学中的应用意义出发,探究如何在高职英语教学中应用形成性评价体系,着重探讨了实施形成性评价的原则及具体实施方法。  关键词: 高职英语教学 形成性评价 考核模式  一、研究的背景及主要内容  1967年,美国哈佛大学教授斯克里芬在其所著的《评价方法论》中首先提出形成性评价与终结性评价概念。形成性评价
1954年,我正在为失学而苦恼时,恰逢解放军到我们家乡征兵,我赶紧报了名。由于我出身贫农,又有点文化,很顺利就被录取了。我们新兵在县城集中训练了半个月后,就乘火车过长江,
9月10日,中国科技部副部长张来武在银川会见了阿盟秘书处助理秘书长巴德尔·丁·阿拉里一行。张来武对巴德尔·丁·阿拉里一行来华参加中阿博览会表示欢迎。他说,在古代,中国
今年以来,省委、省政府团结带领全省上下深入贯彻习近平总书记“一个希望,三个着力”的重要指示精神,认真落实党中央、国务院各项决策部署,坚持“十六字”方针,认真组织实施
根艺精品在常州世界根艺在中国@吴琴芳@盛湘群根艺精品在常州世界根艺在中国屠一道根艺藏珍馆简介吴琴芳盛湘群在飞红滴翠的常州红梅公园曲池风荷的景区,有一座占地2000余平方米的庭
期刊
这是一本根据儿童阅读特点编纂的二战读物,是中国大百科全书出版社和英国DK公司为纪念反法西斯战争胜利70周年同步出版的二战百科全书。这里有真实的战地图片和前沿的CGI成像
期刊
湖北省京山县首届盆景根艺展览于1997年5月7日在县礼堂举行。此次共展出盆景204盆,根艺作品180余件。县委、县政府、县人大等领导出席开幕式。 Jingshan County, Hubei Pro
本文首先介绍核电的某些知识和概念,包括核电站结构、核电站反应堆堆型和核电技术分代。然后叙述核电的发展历程和目前中国应用的典型核电技术方案。文章回顾了中国核电建设