田山电灌站的技术性能测试及技术改造

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:vierilv
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、引言田山电灌站是山东省最大的电灌工程。该电灌站设计灌溉面积为31.7万亩,总扬程67.2m,分二级提水,控制平阴、(?)城两县11个乡镇的土地。二级站装有24Sh-9A型水泵,配20台功率为650KW的电动机。电灌站提水流量为18m~3/S,灌溉面积27万亩,同时解决山区6.2万人畜饮水问题。1983年4月,水利电力部农水司确定田山电灌站为节能挖潜生产 I. INTRODUCTION Tian Shan electric pumping station is the largest electric irrigation project in Shandong Province. The irrigation station designed irrigated area of ​​31.7 hectares, a total lift of 67.2m, divided into two levels to control Pingyin, (?) City, two counties and 11 townships of land. Secondary station equipped with 24Sh-9A-type pump, with 20 sets of power 650KW motor. Electric pumping station to raise water flow of 18m ~ 3 / S, irrigation area of ​​27 mu, while addressing the 6.2 million people in rural drinking water problem. In April 1983, the Department of Water and Electricity, Ministry of Water Conservancy and Electricity, determined that Tianshan Electric Irrigation Station was to tap potential for energy saving
其他文献
辽宁省对外贸易经济合作厅厅长于利人同志参与了省委制定外向牵动战略的工作,并陪同顾金池书记、闻世震省长前往广东、上海、深圳等地学习考察过。为此,本刊记者就实施外向牵
坚定不移地实行对外开放,扩大对外开放程度。提高对外开放水平。这是党的十四届五中全会《建议》提出的今后我国经济和社会发展必须贯彻的一条重要方针。认真学习十四届五中
南联盟经济现状和南中经济合作的可能性南联盟驻华大使斯洛博丹·翁科维奇一、南斯拉夫联盟共和国的经济:问题和前景为了了解南斯拉夫的经济现状,需要简短地回顾一下它的迄今发
调研借鉴结构性叙事研究方法,以英语专业为例,调查新生在学习方面的不适应及其成因。调查发现新生主要由于中学学习的烙印,在学习目标的设定、学习模式、学习内容、学习资源
当前,在世界大部分地区都面临着水资源的危机。但英国的英格兰和威尔士地区,通过水资源的管理,比较成功地实现了水的良性循环,促进了城市经济的发展,并做到了经济、 Curren
壁紊流剪切流的时均流速分布规律,是基础研究课题之一。它与阻力损失、边界层发展、浓度分布、热量传输等生产实际问题有密切联系;又与紊流机理探讨等理论课题有关。紊流脉
三峡工程的投资(包括水工、电机、移民三部分)是合理的和可行的. 三峡工程开发应按水电开发优化排序,它的容量和1990年以后每年需投1000万Kw以上是相适应的. 三峡工程优于其
悬吊式水轮发电机一般是在镜板与推力头之间加装一层绝缘垫,采取修刮绝缘垫的方法来调整机组的轴线,减小机组的振动和摆度。如果绝缘垫材料采用不当时,随着机组运行时间的增
哈尔滨市地下水超量开采,1991年将全部枯竭;地表水污染严重,全市面临水资源危机。这是不久前参加哈尔滨市水资源合理开发及保护研讨会的代表一致发出的警告。代表们指出,哈
一、主语的选择在《论语》中,主语省略的情况比比皆是。学者们在补充主语时,常常仁者见仁,各执一词。其实,许多分歧应该是可以避免的。下面是杨伯峻先生《论语译注》在主语选