Economic Analysis of Liquefied Natural Gas Floating Production Storage and

来源 :Advances in Petroleum Exploration and Development | 被引量 : 0次 | 上传用户:wyt20070210
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  [a] Department of Petroleum and Gas Engineering, University of Port Harcourt, Nigeria.
  *Corresponding author.
  Received 14 December 2012; accepted 9 March 2013
  Abstract
  The global yearning for clean and safe environment coupled with the need of monetizing stranded gas fields to meet the growing demand of Natural gas in the world today has called for understanding of the range of potential for commercial realization of Liquefied Natural Gas Floating Production Storage and Offloading Plant (LNG FPSO). This places a heavy burden on the economic evaluation process which will give the maximum insight into the basis for a decision to invest or not to invest in the LNG FPSO. An economic analysis of 5.2 million tonnes per annum (MTPA) LNG FPSO plant was undertaken. A Monte Carlo simulation method was adopted in this study through the use of Crystal Ball Software. The key uncertainties were represented and their respective impacts on economic viability defined. The deterministic model results obtained from the studies were very impressive with Net Present Value of $2.3 billion at a discount value of 15% and Internal Rate of Return at 32.68%. Probabilistically, 74.96% certainty of having a positive net present value (NPV) and good IRR values far above the hurdle rate for investment in Nigeria was obtained. These clearly showed that LNG FPSO is profitable. Certainty of payback period of not exceeding 5 years was obtained to be 55.89%.
  Key words: LNG FPSO; Offshore LNG liquefaction; Probabilistic approach; Sensitivity analysis; Economic yardstick
  Lazson, N. D., & Ikiensikimama, S. S. (2013). Economic Analysis of Liquefied Natural Gas Floating Production Storage and Offloading Plant (LNG FPSO) Using Probabilistic Approach. Advances in Petroleum Exploration and Development, 5(1), -0. Available from: URL: http://www.cscanada.net/index.php/aped/article/view/j.aped.1925543820130501.1007
  DOI: http://dx.doi.org/10.3968/j.aped.1925543820130501.1007
  INTRODUCTION
  As gas flaring becomes more unacceptable from a political and environmental viewpoint, there is a need to adopt solution that will put an end to those practices. Floating Liquefied Natural Gas Plant will serve as the best solution to avoid flaring and gas re-injection into the wells. Gas re-injection sometimes offers a solution but this is expensive for deep wells and not desirable for all reservoir structures (CompactGTL, 2010). It will be good if proposals for new oilfield projects in remote or deepwater locations demonstrate how produced associated gas will be processed without continuous flaring.   Moreover, Liquefied Natural Gas demand is growing appreciably, especially for use as fuel for power generation in modern combined-cycle gas turbine plants and therefore reviewing cost reduction strategies and techniques is justified across the range of LNG plant types and sizes (Adrian et al., 2004). As demand continues to grow and the value of natural gas remains high, the impetus to monetize non-traditional gas resources also grows (Barclay et al., 2006). However, a considerable portion of the world’s natural gas falls into the category termed “Stranded” where convectional means of transportation via pipeline is not convenient or economical (Ekekpe and Onyekonwu, 2007). The main driver of gas utilization projects in Nigeria and other developing countries had been the governments’ desire to create more wealth by diversifying the economy of the country and end gas flaring. Also with a combination of new government incentives and pressure from the environment ministry to end flaring, coupled with rising domestic industrial demand for gas have now encouraged operators to go into gas projects (Centre for Energy Economics, 2009).
  After the successful and proven track record of offshore crude oil field developments employing floating production, storage and offloading systems (FPSO) and use of barge transport for LNG facility, the industry is now looking with great interest into solutions for monetizing stranded offshore gas fields through the integration of onshore LNG and offshore FPSO technology concepts. The integrated application is known as Floating LNG Production or LNG FPSO (Adrian, 2004; Barclay et al., 2006; Nexant, 2009). The LNG FPSO concept has generated interest because it offers the potential to:
  - Avoid flaring or re-injection of associated gas;
  - Eliminate the need for potentially long pipelines to shore;
  - Monetise smaller or remote fields of non-associated gas;
  - Reduce exposure to public and increase security of facilities;
  - Lower LNG production costs.
  The LNG (FPSO) concept is based on a ship-like vessel that will be able to produce, store and offload LNG in a marine environment (Barclay et al., 2006; Chiu, 2006; Wood et al., 2007; Wood, 2009; Nexant, 2009).
  The drive to monetize and the clamour for environment degradation due to gas flaring was what led to the development of LNG FPSO for offshore environment. Floating liquefaction technology has emerged as a means of bringing on an additional LNG supply by accessing stranded gas reserves once deemed too remote, too small, or otherwise too difficult for conventional land-based LNG development. LNG FPSOs have shown a number of other inherent advantages over conventional onshore liquefaction plants that have boosted their profile. One of such advantages over conventional liquefaction plants for offshore resources is its ability to be stationed directly over distant fields thus avoiding expensive offshore pipelines and the ability to move the production facility to a new location once the existing field is depleted (Kerbers et al., 2008). Therefore, the objective of this work is to provide a unique approach for assessing the economic viability of a 5.2 MTPA LNG FPSO plant. This would be achieved by carrying out a Monte Carlo simulation to forecast the likely possible outcomes with variable economic parameter such as LNG price, Feedstock price, plant capacity, capital expenditure and operating cost. This will ultimately give an idea of how economical it is to monetize Nigeria stranded gas deposit at the current Natural gas price.   1. TECHNOLOGY OF LNG FPSO
  Offshore natural gas liquefaction is expected to be the next technology and commercial breakthrough for monetizing stranded natural gas resources. LNG FPSOs have shown a number of other inherent advantages over conventional onshore liquefaction plants that have boosted their profile (Kerbers et al., 2008). Offshore natural gas liquefaction has different process requirements than the traditional on land, base-load liquefaction plants. The marinization of LNG technology is seen to be a key success criterion for selecting and applying the most appropriate technology concepts. While Onshore LNG facilities have traditionally focused on thermodynamic efficiency as the key criterion for process selection, offshore LNG will require blending this traditional requirement with space, weight, safety and marine operability considerations (Wood, 2009; Nexant, 2009).
  Offshore liquefaction though still emerging is not a new or novel idea but have been developed along side Floating Production, Storage and Off-loading (FPSO) facilities which are now commonplace for oil production (Adrian, 2004). It was considered in the kangan natural gas field in the Persian Gulf during 1970s. Several studies have been made by Air Products for different companies for building a barge mounted LNG plant offshore. Moss Rosenberg also did the barge design for offshore liquefaction plant. The Salzgitter Group and LGA Gastechnik of Germany in the mid-1970 conducted feasibility studies on construction of barge mounted liquefaction plants using modular construction techniques (Chiu, 2006). The scheme envisaged constructing and outfitting a barge mounted plant in a European ship yard, towing it to West Africa and sinking the barge on the offshore. The idea was conceived to overcome poor site conditions existing along the coast of West Africa that require extensive land reclamation, dredging and long LNG loading line trestles. Kvaerner took the offshore concept further and did a full front end engineering design (FEED) on a two-train, 2.8 MTPA APCI process, mounted on a steel mono-hull vessel with 165,000 m3 of Moss storage (Chiu, 2006). Now TEAM West Africa has gone ahead to bring this over 30 years of conceptualisation into reality. It is now constructing LNG FPSO in Korea capable of producing 5.2MTPA of LNG with provision for LPG and Condensate extraction and storage as well as space for LNG storage. It is meant to be deployed to offshore areas of West Africa by 2012.   This floating facility can be moved and reused; this will substantially reduce the risk associated with a stationary investment facility. An LNG project represents an integrated chain of investments and commercial agreements linking exploration, production, transportation and marketing activities. A floating liquefaction plant can reduce the cost of production link as well as provide maximum flexibility in developing gas resources. It has been estimated that a floating LNG project might be 20-30% cheaper than a comparable size of land based project and construction time 25% faster. The floating plant’s mobility will reduce the construction cost of new pipelines and compression facilities that might otherwise be required to bring the gas to a land-based plant. It reduces years off of a project schedule in terms of land acquisition and reclamation and save over hundred ($100) millions of dollars in site preparation and dredging cost (Chiu, 2006).
  The selection of the liquefaction technology and corresponding equipment in an LNG FPSO is critical to reducing risks and increasing project viability, while meeting production and market targets and controlling costs. Liquefaction technologies vary in sophistication and power requirements such that selecting the optimum design depends on many factors, which vary from project to project. Industry studies, including those performed by Nexant, suggest that liquefaction technology on its own does not substantially make one liquefaction process more efficient than any other. Rather each technology for onshore liquefaction plants is competitive within certain ranges of feed gas specifications, ambient conditions, and train sizes. Adrian et al. (2004), Barclay et al. (2006) and Nexant stated that Floating LNG facilities provide a choice for economical development of remote offshore gas fields. Adrian et al. (2004) further proved that refrigeration cycles using expanders are the best choice even for large offshore plants as they give a safer and more compact plant, thus minimizing the overall size and cost of the carrier vessel. Expander cycle has been widely acceptable to be the best for use in offshore LNG plant. Table 1 shows comparison of Expander cycle with other refrigeration cycle.
  2.2 Capital Expenditure
  The capital expenditure or cost (CAPEX) of $2.2billion as stated earlier will be used for this analysis which basically covers the plants Engineering, Procurement and construction (EPC). The capital cost range of US$450 to US$750 per ton was predicted by different author and vendor such as Nexant, (2009), Flex, (2009) and Tusiani et al. (2007). Comparing with the specific capital cost of an onshore base load liquefaction plant of similar capacity can be as high as $1000 per ton of LNG production. This higher cost is as a result of pipeline to shore, site preparation, harbor dredging and docks. These costs range estimate excludes field development and shipping costs. Table 2 also shows the capital cost analysis of FLNG plant by three different countries as was given by Team Africa (2005).   2.3 Annual Operating Cost
  The operating cost according to Nexant (2009) and Flex (2009) is $22 - $29/ton of LNG produced, depending on the liquefaction employed. Tusiani et al. (2007) estimated it as 2-5% of the capital expenditure. These costs comprise labor, fuel gas requirements, the consumption of catalyst, refrigerants, chemicals and lubricant, and maintenance programs that include materials, supplies, support services, and offshore logistics, operational maintenance of facilities, overhead cost, environmental compliance, payroll, etc and feedstock cost not included. $22 per ton is assumed to be the base case for annual operating expenditure since Nitrogen expander cycles is widely acknowledged to be the cheapest and best suitable for LNG FPSO.
  2.4 Products Prices
  Natural gas and LNG prices tend to be very volatile with relatively constant prices with occasional extremes which make it very difficult to predict its future prices. Some of the factors affecting the price volatility are demand (economic factors, weather and electricity sector), supply (drilling, pipelines and imports), prices of other fuels (Oil & coal), and storage. It has been shown to constantly vary from $3/mmbtu ($153.9/ton) to $13/mmbtu ($666.9/ton) (Argus, 2010). The base case of $300/ton was fitted to triangle distribution using the product cost range.
  2.5 Model Backbone
  The model for assessing the economic viability of LNG FPSO adopted here was according to Ikoku (1984), Mian (2002), Mamora (2005) and World Bank (2004) for cash flow analysis, Net Present Value, Internal Rate of Return, Payback time, Profitability Index, Present Value Rate, Undiscounted profit to Investment Ratio. This also corresponds to excel inbuilt formulas with corrections made by Charnes (2007) for NPV. The algorithms that were adopted in this economic analysis are in line with all Monte Carlo simulation processes. This includes identifying options, building a model, adding Stochastic assumptions, running the Crystal Ball, analyzing forecasts, running sensitivity analysis, running Tornado and Spider and finally making Decision (Ikoku, 1984; Mian, 2002; Mamora, 2005; Charnes, 2007).
  3. METHODOLOGY
  A spreadsheet-based deterministic economic model was utilized in the early evaluation stages of this study to appreciate and characterize the opportunities and the impact of uncertainties through single point sensitivity analysis as shown in Table 3. However, a purely deterministic approach is limited in capturing the full impact of the high number of interdependencies of the characteristic variables on the LNG FPSO. A stochastic approach was incorporated in this analysis. This probabilistic approach has an advantage over deterministic approach that uses a single point solution and would not show how optimistic or pessimistic the results might be as stated by William et al. (2007) and Charnes (2007). According to William et al. (2007), it is imperative for any economic analysis to be able to provide logical and well-thought through answers to the following questions such as: a) what is the probability of achieving the key profitability metrics? b) What is the probability of breakeven at a given price? c) What is the maximum exposure?   Table 3
  4. PROBABILISTIC ASSUMPTIONS
  The probability distribution chosen reflects the fitted distribution for the historical realization of the variable. Triangular distribution was used for most of the variables because it best estimates the distribution using the maximum and minimum plus most likely values. To implement this aspect of generating the probabilistic data, a specially designed software package was used for the analysis called Crystal Ball 11.1.1. The software is an add-in to excel. It performs an iterative recalculation of values of the economic measures of the cash flow model already developed in spreadsheet when there are changes in any or all of the parameters that drives the cash flow model (Charnes, 2007). This software uses a Monte Carlo simulation procedure to generate for each trial values of the key parameters such as LNG Price, Capital Cost, Operating Cost and Feedstock cost corresponding to the economic measures (NPV, IRR, Proftability Index, Payback time, profit to Investment Ratio) as indicated by Ikoku (1984), Mian (2002), Mamora (2005), Ekekpe et al. (2007) and Charnes (2007). For this study sampled 10,000 trials for each of the six models was used.
  5. RESULTS
  The sensitivity analysis, Tornado and Spider charts of this study with respect to the Net Present Value (NPV) and the Internal Rate of Return (IRR) as yardsticks will be shown to enhance quicker and easier decision making. Probabilistic plots of acceptable ranges will be displayed to drive home the economic analysis.
  5.1 LNG FPSO CASH FLOW ANALYSIS
  Table 4 shows the input assumptions for the Monte Carlo simulation of the 5.2 MTPA LNG FPSO plant (these values are taken from section 3.1 to 3.5) while Table 5 shows the minimum, likeliest and maximum distribution types used alongside the input parameters.
  5.2 DISCUSSION
  The cash flow spreadsheet (Table 3) model result for LNG FPSO as presented in Table 4 shows the computation of the economic measures. The cash flow model result showed some impressive outcomes about the profitability of LNG FPSO projects based on deterministic model. It returned a positive and large NPV after tax of $2.3billion at a discount value of 15%. A discount rate of 15% was used in this study because by the World Bank standard it stands to be the hurdle rate for oil and gas investments in Nigeria (World Bank, 2004). The decision rule is to accept all projects with positive NPV values. The discount factor is assumed to take care of inflation and some uncertainty in the time value of money. The undiscounted cumulative profit to investment ratio deterministically is obtained as 5.56. This implies that the profit is 5.56 times as big as the initial investment. It is a good ratio for an investment without considering time value of money. The Present Value Rate tries to evaluate the effects of inflation rate and other uncertainty in the investment. It also helps to portray or quantify the size of the investment. Its decision rule is to accept investment with positive PVR. As shown in Table 6, the value of PVR is 1.05 at a discount factor of 15%. In addition, an Internal Rate of Return of 32.68% was obtained which is quite impressive as it is above the standard hurdle rate for investors in Nigeria (Adenikinju, 2008; World Bank, 2004). Internal Rate of Return takes care of factor such as high volatility of currency and exchange rate. This implies that inflation rate will hardly affect the profitability of the venture. The Net Present Value probability distribution as shown in Figure 1 gave the entire possible range of forecast for NPV taking recognizance of uncertainty in our input probability distribution.   Table 7 shows the range of values permissible for best economic output base on the probabilistic approach. For the Natural Gas consumption, a 70 % certainty for a constant availability and consumption was assumed. The NPV distribution (Figure 2) shows the certainty of having NPV between the breakeven points (NPV of zero) to the maximum value of NPV $4184, 237, 851.55 to be 74.96%. This shows a high confidence region in spite of uncertainties in the prices of LNG and Feedstock and other variables.
  The distribution for the Internal Rate of Return (Figure 3) shows 72.46% certainty of having an Internal Rate of Return (IRR) above 15% hurdle rate for investments in Nigeria adopting World Bank guideline. This gave a possibility of having Internal Rate of Return up to 46.66% from this project.
  The Payback period distribution (see Figure 4) is skewed to the left showing an early recovery of initial investment. This gave 55.89% certainty of recovering the initial investment between 1.45 and 5 years. Since Capital is a scarce resource, short Payback period is more desirable as it will help the investor recover the Capital quickly.
  Profitability index of above 1 is desired. The certainty of having Profitability Index of 1 and above in this probabilistic approach gave 74.24% (see Figure 5). In the case of PVR, PVR above zero is desirable. The PVR of this project (Figure 6) laying above zero corresponds to a certainty of 74.24%. Also a certainty of 94.37 % was obtained for Profit to Investment ratio (see Figure 7) to have values spanning between 1 and 8.14.
  Figures 8 to 10 show the sensitivity analysis on NPV, IRR and Payback Period respectively. It shows the various effects of changes in the value of LNG price, Natural Gas Feed stock Price, Capital Expenditure and Operating Cost on the economic indices like NPV, IRR and Payback Period. It was equally observed that the sensitivity analysis of Profitability Index, profit to Investment Ratio and Present Value Rate followed the same trend (figures not included) with IRR. This would aid decision making as LNG price was discovered to be the most sensitive parameter whose slight changes will affect the profit earning of any investor. For instance as shown on Figures 8 to 10, the LNG price will affect the Payback period by 36.2%, NPV by 42.9% and IRR by 38% . It is also clear from these figures that, increase in the value of LNG price reduces the Payback period while increasing the value of NPV and IRR.   Tornado charts (Figures 11 &13) are used to measure the effect of changes in any variable on a selected forecast (NPV). This was done deterministically by the Crystal ball software while sensitivity was done probabilistically. Figures 11 and 13 show the extreme values of NPV with respect to the effect of the changes made to the variable parameters (LNG price, Feedstock price, plant capacity, Capital cost and Operating cost). The spider charts (Figure 12 & 14) tries to depict the effect of the parameters with the steepness of the slope. The spider charts show that LNG price is most sensitive. This is also confirmed by the Tornado charts.
  CONCLUSION
  The results obtained from the studies were very impressive with NPV of $2.3 billion and IRR of 32.68% gotten from the deterministic model. Probabilistically, 74.96% certainty of having a positive net present value (NPV) and good IRR value were obtained and these clearly shows the profitability of this 5.2MTPA LNG FPSO. Certainty of payback period of not more than 5 years was obtained to be 55.89%. Any reserve with capacity of 5.34 TCF will be good for this plant as it will sustain the plant for twenty (20) years.
  The sensitivity analysis outlined LNG Price and Feedstock Price as key sensitive parameters in maximising profit. The deterministic analysis decision making only would not have provided insights of certainty value and sensitive parameters. Therefore, the probabilistic approach helped to forecast the effects of the uncertainty associated with the variable parameters and gave ranges of all the possible profit/loss that would be encountered as in Figure 1. Offshore LNG liquefaction plant is economically viable. With the help of the range of the economic indices shown in Table 7, it is clear that Offshore LNG Plant will yield quick return on investment.
  REFERENCES
  [1] Adenikinju, A., & Oderinde, L. O. (2009). Economics of Offshore Oil Investment Projects and Production Sharing Contracts: A Meta Modeling Analysis (Doctoral dissertation). Department of Economics, University of Ibadan, Nigeria
  [2] Adrian J F, Grant L. J., & Terry R. T. (2004). LNG Technology for Offshore and Mid-Scale Plants. Manchester, UK: Costain oil, Gas & Process Limited.
  [3] Argus Median Ltd (2010). Argus Monthly Global LNG, IV(11).
  [4] Augustin, L., Birch, V., Grulich, A., Gutierrez, S., Pasternak, J., & Shelton, J. (2005). Design of a Floating, Production, Storage and Offloading Liquefied Natural Gas Facility for Offshore West Africa. Design of Ocean Engineering Facility Ocean Engineering Program, Texas A&M University, USA.   [5] Barclay, M. A., & Yang, C. C. (2006). Offshore LNG: The Perfect Starting Point for the 2-Phase Expander? Offshore Technology Conference, Texas, USA.
  [6] Barclay, M., & Shukri, T. (2007). Single Mixed Refrigerant Process Has Appeal for Growing Offshore Market. LNG Consultants, Foster Wheeler Energy, USA.
  [7] Charnes, J. M. (2007). Financial Modeling with Crystal Ball and Excel. New Jersey, USA: John Wiley & Sons, Inc.
  [8] Chiu, C. H. (2006). Commercial and Technical Considerations in the Developments of Offshore Liquefaction Plant. 23rd World Gas Conference, Amsterdam, UK.
  [9] Chiu, C. H., & Quillen, L. D. (2008). A New Frontier! Offshore Natural Gas Liquefaction. Gastech., March 10 -13, Thailand.
  [10] CH·IV International (2006). Safety History of International LNG Operations. Hanover, Maryland, USA: The LNG Specialists.
  [11] CompactGTL plc (2010). Modular GTL as an Offshore Associated Gas Solution. Deep Offshore Technology Conference, Amsterdam.
  [12] Cornot-Gandolphe, S., Appert, O., Dickel, R., Chabrelie, M., & Rojey, A. (2003). The Challenges of Further Cost Reductions for New Supply Options (Pipeline, LNG, GTL). 22nd World Gas Conference, Tokyo, Japan.
  [13] Dong, L., Wei, S., Tan, S., & Zhang, H. (2008). A Techno-Economic Comparison of GTL with LNG. China: Chongging University.
  [14] Ekekpe, J., & Onyekonwu, M. (2007). Economics of Gas to Liquid Technology. Petroleum Training Journal, Abuja, Nigeria.
  [15] Foss, M. M. (2007). Introduction to LNG. Centre for Energy Economics, Bereau of Economic Geology, University of Texas, USA.
  [16] Foss, M. M. (2004). The Role of LNG in North American Natural Gas Supply And Demand. Centre for Energy Economics, Bereau of Economic Geology, University of Texas, USA.
  [17] Foss, M. M. (2009). Gas Monetization in Nigeria. Centre for Energy Economics, Bureau of Economic Geology, University of Texas, USA.
  [18] Ikoku, C. U. (1985). Economic Analysis and Investment Decisions. USA: John Wiley & Sons Inc.
  [19] Jensen, J. T. (2002). LNG and Pipeline Economics. Chicago, USA: The Geopolitics of Gas Meeting.
  [20] Kerbers, I., & Hartnell, G. (2008). Breakthrough for Floating LNG. New York, USA: Poten & Partners, Inc.
  [21] Linde Engineering. Retrieved from www.linde.com
  [22] Mian, M. A. (2002). Project Economics and Decision Analysis, Vol 1: Deterministic Models. Tulsa, Oklahoma, USA: PennWell Publishing Co.   [23] Mian, M. A. (2002). Project Economics and Decision Analysis, Vol 2: Probabilistic Models. Tulsa, Oklahoma, USA: PennWell Corporation.
  [24] Mamora, D. D. (2005). Fundamentals of Oil and Gas Economic Evaluations and Risk Management. Texas, USA: Texas A&M University College Station.
  [25] Nexant Inc. (2009). Floating LNG Production. New York, USA: Chemsystems Perp Program.
  [26] Tusiani, M. D., & Shearer, G. (2007). LNG, A Non Technical Guide. Tulsa, USA: Pennwell Corporation.
  [27] Wilngaarden, W. V., & Meek, H. J. (2008). The Generic LNG FPSO—A Quick & Cost-Effective Way to Monetize Stranded Gas Fields. SPE Asia Pacific Oil & Gas Conference and Exhibition, Australia.
  [28] Gray, W. M., Chiappe, A., & Koosh, V. H. (2007). A Probabilistic Approach to Shale Gas Economics. SPE Hydrocarbon Economics and Evaluation Symposium, Texas, USA.
  [29] David, W. (2009). Floating Gas liquefaction: Competing Technologies Make Progress. Lincoln, UK: E&P Magazine.
  [30] Wood, D., & Mokhatab, S. (2007). Offshore Natural Gas Liquefaction Process Selection and Development Issues. SPE Annual Technical Conference and Exhibition, California, USA.
  [31] World Bank. (2004). Taxation and State Participation in Nigeria’s Oil and Gas. Retrieved From Http: www.esmap.org/filez/pubs/05704NigeriaTaxationMcPherson.pdf
其他文献
我的同学柳小乐是个有点神奇的男孩。  柳小乐有一张花栗鼠那么可爱的脸蛋,一双夏夜星空般的大眼睛里,闪烁着调皮的小星星。他最喜欢的书是《老人与海》,用他的话说,圣地亚哥整整八十四天没钓到一条鱼,也没有掉一滴眼泪。他也赞赏欧·亨利的观点:人生是一个含泪的微笑。  柳小乐长得可爱,却被大家认为是个难缠的家伙。他胆子大、力气也大,不管什么运动都拿手,还是男生的领头羊。遇到问题,女生也喜欢找他帮忙,因为他总
期刊
我曾看过一幅漫画,画面上有四盏灯。第一盏灯最亮,它说:“我有一个想法,我要去做!”第二盏灯略暗,它犹豫地说:“我可以做到吗?试试看吧。”第三盏灯昏暗,它说:“周围的人都不赞成我做,这件事做起来应该很难吧?”第四盏灯黑暗,它说:“那就算了吧!”  这幅漫画通过四盏灯光亮度的梯次减弱,直至完全熄灭的现象,形象地告诉了我们“理想之灯是如何熄灭的”的道理。很多人都有理想,但真正能实现理想、把理想变成现实的
期刊
阳春三月,春暖大地,正是万物复苏的好时节。望着窗外一片春意盎然的景象,我不由得想起了去年植树节。为了保护环境,我也曾在东湖公园里种下一棵梧桐树。如今已过去一年了,我很想知道我的梧桐树長了多少,于是,我二话不说地来到了东湖公园。  费了好一会儿工夫,我总算找到了我的梧桐树。没想到一年前的小树苗如今已长成半人高了。感叹植物生命力旺盛的同时,我还深深地感到骄傲和自豪,尽管这一年来我并没有抽时间来照顾它。
期刊
有一个段子说,一个内向的芬兰人和你说话的时候会看着自己的鞋子,一个外向的芬兰人和你说话的时候会看着你的鞋子。“精芬”指的就是精神上的芬兰人,泛指像芬兰人一样不爱社交、活在自我世界的一类人。  “精芬”一词来源于芬兰的绘本《芬兰人的噩梦》,里面的主人公马蒂害怕跟人接触,尽量避免社交。马蒂对人群和聊天的恐惧及其容易感到尴尬的倾向引起了许多“精芬”少年的共鸣,他们纷纷表示:绘本中的马蒂不就是我吗?  在
期刊
如果面包店里有一本《秘密树洞》,你会对它写下什么样的悄悄话?对于钟爱甜点和热饮的吃货来说,想倾诉的话一定数不胜数。  天气渐渐转寒,升初二后老师留给我们的练习题越来越多,不多补充些热量怎么行呢?于是我和林苑一起来到了校门口的面包店。我点了杯热牛奶和芝士蛋糕,可是下一秒,我就瞥见了林苑委屈的小眼神。  我有点困惑,翻开了眼前那本《秘密树洞》,发现了林苑写下的话:“好想喝醇香浓郁的热牛奶,好想吃漂亮新
期刊
开学前一天,李月晓和徐飞燕、汪思嘉约好中午一起到人民公园野餐。当李月晓将奶奶一大早给大家准备的咖喱鱼丸和奶茶拿出来展示在众人面前时,徐飞燕立马露出垂涎欲滴的表情,汪思嘉却注意到装奶茶的塑料瓶变形了。  汪思嘉拿起一瓶用旧饮料瓶盛装的奶茶放在手里捏了捏,只觉得塑料瓶软绵绵的,形状也立马改变了一些,只怕稍一用力,手里的塑料瓶便能被她毁掉。  “天啊!你怎么能用塑料瓶装奶茶呢!”心直口快的汪思嘉说,“你
期刊
音乐课上,音乐老师听说李婷婷最近开始学小提琴了,于是提议她给大家演奏一曲。虽然觉得自己拉得还有些不成曲调,但看着音乐老师鼓励的眼神,李婷婷决定还是试一试——据她所知,音乐老师可是一个拉小提琴的高手,如果能得到老师的指点,那自己可就赚了!   抱着这样的想法,李婷婷拿起了小提琴,拉了一曲《霍拉舞曲》。作为初学者来说,这首曲子曲式结构很简单,还是支回旋曲,拉起来还是比较容易的。所以,虽然技巧上还有些生
期刊
小希这几天不知道怎么搞的,突然喜歡上掏耳洞了。只要是没事做的时候,她就找个细小的东西在耳朵里挖啊挖,有时还会掉出一些黄色的东西。小希想,这些一定是耳朵里的脏东西,老师和妈妈不是经常告诉我们要讲究卫生吗?那就要把耳朵里的脏东西都清除出去。  可是没过两天,问题就来了。这天早晨,小希吃完早餐,准备去上学,突然觉得耳朵有些痛。她不得不喊妈妈:“妈妈,我的耳朵好疼呀!”  妈妈一听,赶紧跑了过来,仔细看了
期刊
“美丽的神话总少不了仙女的身影。瞧,这边是掌管山丘的山丘仙女,那边是守护湖泊的湖泊仙女,就连森林里的一棵棵树木都需要仙女的细心呵护……”故事讲到这儿,突然,妈妈神秘地笑了,“小宁,其实我们身上也住着一位仙女,你发现她了吗?”  小宁连忙点头。她知道妈妈说的这位仙女其实就是我们身体里的免疫力。每次小宁身体出了小问题的时候,住在她体内的这位小仙女总是能及时地跑出来挥动免疫的魔法棒,把所有意图破坏健康的
期刊
爸妈周末不在家,杜聪简直突然感觉到一种乐翻天的自由!终于没有人管手管脚,在家里可以想干什么就干什么了,这样的周末多么完美!所以,星期六一大早,他就打电话把小区里平时一起玩的小伙伴喊到家里来玩了:“今天我家没有大人在!”  听到这句话,平时都被家长管得比较严的小伙伴们立刻响应,没多久,他们就来敲门了。于是,位于24楼的杜聪家热闹起来了。  一开始,大家凑在一起一边玩起了“王者农药”,一边聊着天。后来
期刊