成都国金中心T1&T2塔楼建筑高度247.8m,采用框架-核心筒结构体系。结构设计采用性能化设计思想,确定明确的总体及重要构件的抗震性能目标,提高结构的可靠性。在具体施工过程中,通过课题攻关,解决了在复杂渗水环境下超厚外墙的施工、筏板大体积混凝土裂缝控制、钢筋密集部位构件混凝土振捣、高空钢管内混凝土浇筑及钢管柱变截面等一系列问题,取得明显的经济效益和社会效益。
Chengdu International Financial Center T1 & T2 tower building height of 247.8m, using the framework - the core tube structure system. Structural design using performance-based design ideas, to determine a clear overall and important components of the seismic performance objectives, improve the reliability of the structure. In the concrete construction process, through the tackling of key issues, solved the construction of super-thick outer wall in complex water seepage environment, the crack control of mass concrete in raft, the concrete vibrating in intensive parts of steel bar, the concrete pouring in high-altitude steel pipe and the variable cross-section of steel pipe column And a series of issues, access to significant economic and social benefits.