美国在横跨旧金山海湾的新敦巴顿大桥引桥基础工程中,首次大规模地运用了排水板辅以渗水织物排水,部分锯末(减载)充填的深层综合软基处理法,取得很好效果。新桥建成后将取代1927年启用的原敦巴顿公路桥,新桥位于原桥以北27米处。原桥引桥路基,车道系由旁侧挖泥填筑,其上铺放外运填土,再浇筑沥青路面而成。其车道因年久沉降出现空穴,凹陷,致使高潮水入浸,威胁路面,故予以拆除。
The United States made the first large-scale use of the drainage board combined with seepage fabric drainage and partial sawdust (load shedding) deep comprehensive soft foundation treatment method in the new bridge junction project of the Newton-Barton Bridge across the San Francisco Bay. After the completion of the new bridge will replace the 1927 enabled the original dunbatun road bridge, new bridge is located 27 meters north of the original bridge. The original bridge approach bridge subgrade, the driveway is dredged by the side of the road, which lay on the alluvial fill, and then pouring asphalt pavement. Due to its lanes due to settlement of holes, depression, resulting in orgasm water immersion, threatening the road, it was removed.