论文部分内容阅读
西陵长江大桥施工过程中,监理方充分发挥了对质量、进度和投资的主动控制作用,并随着工程的进展采取动态管理措施,取得了良好的效果,使西陵长江大桥的各控制项目基本实现了预定控制目标。
During the construction of the Xiling Yangtze River Bridge, the supervisory party gave full play to its active control over quality, progress and investment. With the progress of the project, it adopted dynamic management measures and achieved good results, basically realizing the control projects of the Xiling Yangtze River Bridge The scheduled control objectives.