论文部分内容阅读
本文以小湾水电站泄洪洞出口下游永久大桥桥基防护工程为例,对防冲墙施工方案选择、施工工艺流程、施工方法、质量控制等方面进行介绍,为防冲墙在桥基防护中的实际应用提供借鉴与参考。
This paper takes the protection of the bridge foundation of the permanent bridge downstream of the spillway tunnel of Xiaowan Hydropower Station as an example to introduce the construction scheme selection, construction process flow, construction method and quality control of the anti-collision wall. The practical application provides reference and reference.