我公司是从事林业基本建设的,现有职工二千七百多人,主要工程机械230台(套),其中推土机42台、自卸汽车46台、铲运机13台、装载机8台、挖掘机4台、压路机12台,还有平地机、混凝土搅拌机、凿岩机和空压机等。年平均完成士石方约101.5万米~3,机械完好率年为86%,利用率为68%。施工期完好率为96%,利用率为81%,使用多年的老设备台台在用,新设备完好。1974年进口的10台 D80A-12型推土机和 TKL-20型自卸汽车使用至
Our company is engaged in basic forestry construction. It has more than 2,700 employees and 230 main engineering machinery (sets), including 42 bulldozers, 46 dump trucks, 13 scrapers, and 8 loaders. 4 excavators, 12 road rollers, graders, concrete mixers, rock drills, and air compressors. The average annual completion of Shishifang is about 1.015 million meters~3. The mechanical integrity rate is 86% and the utilization rate is 68%. The completion rate during the construction period was 96%, and the utilization rate was 81%. The old equipment used for many years was in use, and the new equipment was in good condition. Ten D80A-12 Bulldozers and TKL-20 Dump Trucks imported in 1974 were used until