论文部分内容阅读
随着我国电力输变电工程建设要求的不断提高,传统的设计管理模式已越来越难以满足系统内外对设计质量和进度的要求。设计是工程建设的龙头,只有抓住了设计这个“牛鼻子”才能更好地解决工程建设质量和进度等相关问题。电力输变电工程施工管理的科学理念实践取得了良好成效;设计管理,在质量和进度控制上一定程度与施工管理有着异曲同工之妙。学习借鉴现代工程施工管理先进、成熟的管理方法,将施工管理理念应用
With the continuous improvement of the construction requirements of China’s power transmission and transformation projects, the traditional design management model has become increasingly difficult to meet the requirements of the design quality and schedule both inside and outside the system. Design is the leading construction project, only to seize the design of this “cow nose” can better solve the construction quality and progress and other related issues. The scientific concept of construction management of power transmission and transformation project has achieved good results. Design management has similar advantages to construction management in quality and schedule control. Learning from modern engineering construction management advanced and mature management methods, construction management concepts will be applied