论文部分内容阅读
焦家金矿望儿山分矿浅部充填站于2000年投入使用,充填能力为130m3/d,水泥仓规格为96m3。由于机械化程度不高,操作控制完全依靠人工进
Jiaojia gold mine Wang children Hill shallow filling station put into use in 2000, the filling capacity of 130m3 / d, cement silo size 96m3. Due to the low degree of mechanization, operation control depends entirely on manual entry