论文部分内容阅读
由冶金部炼铁情报网中南组与广西炼铁情报网和广西金属学会联合组织的高炉生产薄弱环节研讨会,于1987年10月15~18日在广西贵县钢铁厂召开。会议收到论文40篇,其中有19篇在大会上作了交流。这次研讨会的中心议题是围绕高炉生产薄弱环节开展讨论。从大会发言和小组讨论可以概括出如下倾向性意见: 1.中南五省的高炉工作者围绕着解决高炉生产薄弱环节的问题做了大量工作,并取得了可喜成果。经过多年努力,高炉一代寿命有明显的延长。主要经验是:①炉型设
By the Ministry of Metallurgical Iron and Steel Information Network Zhongnan Group and Guangxi Ironmaking Information Network and the Guangxi Institute of Metals, blast furnace production weak links seminar, October 1987 October 15 Guangxi Guixian Iron and Steel Plant held. The conference received 40 papers, of which 19 were exchanged at the conference. The central topic of the seminar was to discuss the weaknesses in blast furnace production. The following tendentious suggestions can be summarized from the speeches and panel discussions in the General Assembly: 1. Blast-furnace workers from five Central South provinces have done a great deal of work around the issue of resolving the weak links in blast furnace production and have achieved gratifying results. After years of hard work, the blast furnace life has been significantly extended. The main experience is: ① furnace design