钦防铁路位于广西钦州市及防城港市境内,全长38.528km,包含站前桥涵、路基土石方及防护、箱梁制运架、两个站场改造工程。主要工程量为:土石方总数量为693万方;新建桥梁62座,计11983.86延长米,涵洞2542延米/88座,制运架箱梁500孔。中铁十六局集团公司承担该项投资16.47亿元的工程任务。项目开工以来,他们始终坚持“赢在起点、赢在过程、赢在结果、”三赢管理理念,全面实施过程
Qinhuangdao Railway is located in Qinzhou City and Fangchenggang City of Guangxi Province, with a total length of 38.528km, including the bridge front and culverts, roadbed earthwork and protection, box girder handling rack and two station yard renovation projects. The main volume of works is: the total amount of earth and stone is 6.93 million square meters; 62 new bridges, 11983.86 meters of extension, 2542 meters of culverts / 88 seats, 500 holes of boxed transport system. China Railway 16th Bureau Group Corporation assumed the project investment of 1.647 billion yuan. Since the project started, they always adhere to “win in the starting point, win in the process, win in the result, ” win-win management philosophy, the full implementation process