论文部分内容阅读
《华中电力》期刊第二届编委会第一次会议于1997年2月25日在武汉市召开,会议由华中电力集团公司动能经济研究所(技术中心)所长、《华中电力》编委会副主任委员邓建利同志主持,参加会议的有华中四省电力局及试研所、设计院、武高所、武汉供电局、武汉水利电力大学、网局、动经所(技术中心)等单位的编委会成员和代表24人,动经所(技术中心)副所长周宏也参加了会议。华中电力集团公司总工程师、《华中电力》期刊编委会副主任委员赵遵廉同志对如何提高期刊质量作了重要讲话,他要求《华中电力》期刊真正做到为华中电力集团生产建设和发展服务,为提高企业效益,为促进集团公司两个根本性转变发挥应有作用,在紧密结合华中电力工业生产实际,积极交流网内先进生产技术的同时,还应积极跟踪世界电力科技发展,大量刊登一些围挠电力生产建设和发展的重大技术问题积极开展具有长远性、储备性电力科技
The first meeting of the second editorial board of the “Huazhong Electric Power” periodical was held in Wuhan on February 25, 1997. The meeting was chaired by the director of the kinetic energy economics institute (technical center) of the Huazhong Electric Power Corporation and the editor of the “Central China Electric Power”. The deputy chairman Deng Jianli, presided over by the Comrades, attended the conference with the four provincial power bureaus and test institutes, design institutes, Wugao Institute, Wuhan Power Supply Bureau, Wuhan Water Conservancy and Electric Power University, the Internet Bureau, and the Ministry of Action (Technical Center). 24 members of the editorial board and representatives, and Zhou Hong, deputy director of the Technology Center, also attended the meeting. Mr. Zhao Zunlian, chief engineer of Central China Electric Power Corporation and deputy chairman of the Central China Electric Power Journal editorial committee, made an important speech on how to improve the quality of periodicals. He asked the Huazhong Electric Power Journal to truly serve the production, construction and development of the Huazhong Electric Power Group. In order to increase the efficiency of enterprises and to play a role in promoting the two fundamental changes in the group companies, while closely integrating the actual production of the power industry in Central China and actively exchanging advanced production technologies within the network, it is also necessary to actively track the development of the world’s electric power technologies and publish a large number of them. Enormous technical issues concerning power production, construction and development are actively carried out with long-term and reserved power technologies