晋城矿务局古书院矿在选择引进新一代的大功率综合机械采煤设备过程中,遇到了国家投资不足、外汇额有限,无法满足原定引进计划的实际问题。面对困难,我们运用价值工程理论,对设备进行了分析,用有限的资金引进购置了关键设备,配套使用部分国产设备,解决了全国第一个高产高效综采工作面的设备。为八·五期间我国煤炭工业采掘机械化发展迈开了更新换代的第一步。
In the process of choosing and introducing a new generation of high-power integrated mechanical coal mining equipment, the Jinshu Mining Bureau Gushuyuan Mine encountered the problems of insufficient investment by the state and limited foreign exchange, which could not meet the actual problems of the original plan for introduction. In the face of difficulties, we applied value engineering theory, analyzed the equipment, purchased key equipment with limited funds, and used some domestically-made equipment, thus solving the nation’s first high-yield, high-efficiency, fully-mechanized mining equipment. For the period of the 8th Five-Year Plan, the development of mechanization of mining industry in China has taken the first step in upgrading.