论文部分内容阅读
山东电机工程学会城乡供用电专委会(以下简称专委会)挂靠在省电力局生产部(供电),城市电网工作的归口部门也在那里,两者工作紧密结合,做到“三同时”。安排计划,同时安排学会工作;检查工作,同时检查学会工作的完成情况;总结工作,同时总结学会工作的经验教训,提出改进措施。凡属学术讨论性质的工作项目,尽量由学会牵头办理;技术咨询项目,由学会负责进行。
The Shandong Electrical Engineering Society’s Urban-rural Electricity Supply Special Committee (hereinafter referred to as the “Special Committee”) is affiliated with the Production Department (Power Supply) of the Provincial Electric Power Bureau, and the centralized department of the urban grid work is also there. The two work are closely integrated and “three simultaneous ". Arrange the plan, arrange the work of learning at the same time; check the work, check the completion of the work of the society at the same time; summarize the work, sum up the lessons learned from the work of the society, and put forward improvement measures. All work items of academic discussion nature shall be led by the Institute as far as possible; technical consulting projects shall be conducted by the Institute.