科研所水工试验室在设计中拥有二厅一场,水工一厅的面积约为1400米~2,已经建成投入使用,该厅内可进行4~6个整体模型试验。水工二厅的面积约为1100米~2,基建工作大体完成,还需要在其中建造玻璃水槽两座,钢水库三座,估计今年三季度可以部分投入生产,今后可利用那些设备来进行断面模型及单体模型试验,二厅内还可以做1~2个较小的整体模型。露天试验场的面积约为3000米~2,希能一气建成,今后可用来进行滑坡涌浪、导流截流及其他面积较大而周期较短的模型试验。整个循环系统由六台水泵供水,流量可达到1300升/秒。平水塔的水头为九米,塔下装有配水管九根,分别把水引到二厅一场。蓄水池及回水槽总共可蓄水1200米~3。
Research Institute of Hydraulic Laboratory in the design has two hall, a hydraulic hall area of about 1400 m ~ 2, has been completed and put into use, the hall can be 4 to 6 overall model tests. The gross floor area of the Waterloo Hall is about 1100m ~ 2. The infrastructure work is basically completed. There are also two glass tanks and three steel tanks to be built. It is estimated that the third quarter of this year can be partially put into production. In the future, those facilities can be used for the section Model and single model test, two hall can do 1 or 2 smaller overall model. Open-air test site area of about 3000 m ~ 2, hope to build one by one, in the future can be used for landslide waves, diversion and other large and short cycle model tests. The entire circulation system is supplied by six pumps with a flow rate of 1300 l / s. The head of the flat water tower is nine meters, equipped with nine water pipes under the tower, leading the water to the second hall. A total of water storage tanks and backwaters can store 1200 meters ~ 3.