摘要:从上个世纪90年代至今,水泥搅拌桩由于具有价格低廉、技术成熟等优点,在水利、建筑、市政等领域得到了广泛的应用。它能够使用较广泛的淤泥层丰富的软基地区,较好的提高软基承载力。但是水泥搅拌桩的施工管理具有着极强的特殊性,一旦管理不善,也很容易造成施工质量缺陷,必须要加强其施工工艺。本文就现代建筑对水泥搅拌桩施工的要求和其施工工艺做了简单阐述分析。
关键字:水泥搅拌桩、施工、施工工艺
Abstract: from the 90 s to the present day, cement mixing pile because of the low prices, mature technology advantages, such as in water conservancy, construction, municipal fields a wide range of applications. It can use a wide range of silt layer rich soft base area, the better to improve the bearing capacity of soft foundation. But the cement mixing pile construction management has a strong particularity, once bad management, also very easy to cause the construction quality defects, must want to strengthen its construction process. This paper of modern architecture of cement mixing piles construction requirements and its construction process to a simple analysis of the paper.
Keyword: cement mixing pile, construction, construction technology
中图分类号:TU525文献标识码:A 文章编号:
水泥搅拌桩技术在我国已经有了几十年的发展历史,通过在我国很多的大型桥梁、河堤、公路等多样的工程中的成功使用,积累了丰富的施工和检测经验,其技术和工艺已经相当成熟。但是尽管施工工艺相对的完善和成熟,但是由于现代建筑对其施工的要求越来越高,其施工技术和工艺也越来越受到了人们的重视,一旦出现问题,很容易导致短桩、断桩。
现代建筑对水泥搅拌桩施工的要求
现代建筑对水泥搅拌桩施工的要求即在施工过程中对其的质量等方面控制,主要有以下几方面:
(1)施工前,从事喷桩施工的人员必须是经过技术交底,并且桩机的操作员和送灰工必须有专业证,开工前,必须进行及时较低,并有书面记录,还要制定岗位职责和桩机的操作规范;
(2)所有进入到施工现场的桩机等设备都要有出厂合格证,并且配有电子记录仪器,禁止无记录仪的桩机投入使用;
(3)水泥攪拌桩施工前,以桩基布置图为依据测量放样,得到的测量结果汇总后上报监理单位,确认后才可进行施工;
(4)水泥搅拌桩所用的水泥等材料要符合设计要求,进场的材料都需要提前送检,检测合格后才能够投入施工,并且每根桩的水泥只能使用同种品牌,不能够混用;
(5)施工中,在压浆阶段不能够出现断浆现象,保持输浆管路的畅通,禁止发生堵塞,严格按照设计数据操作,控制喷浆和搅拌的速度,保证其加固的强度及连续;
(6)要保证每寸加固范围都要充分搅拌,控制好重复搅拌的速度;要保证起重机的平稳性,保证搅拌桩垂直于地面。支护和各税结构为水泥土搅拌桩的,要保证加固体的连续,相邻的加固体施工间隔小于24小时;
(7)在施工时,如果桩的长度都是统一的数值,可以根据单根桩所需要的水泥浆分一次或者两次进行拌制,保证所用水泥浆的准确配合比,每根桩的水泥浆都充足且均匀。当桩的长度比较短时,可以根据单根桩所需要的水泥浆一次拌制2到3根桩所用的水泥浆,并且在水泥浆罐壁上可以标记单根桩所用的水泥浆的用量刻度线;
(8)对于施工过程中的桩机的具体施工情况,必须要求分台分责管理,要有专门的工作人员进行记录:在值班期间每台桩机的运行是否正常、是否发生机械损坏现象、维修保养时间、维修后的开工时间、是否发生无故停机现象、停机时间、开机时间等。
(9)施工中要避免污染环境,禁止造成施工范围以外的其他建筑物的稳定性的破坏;保护施工现场四周的植物等;做好排水工作,对周边的河水、水田等保持清洁;禁止将施工产生的废水、废料随意倾倒或者直接倒入水塘等;完工后要及时清理施工场地,废渣、废料倾倒在规定的垃圾场;
二、水泥搅拌桩的施工工艺
水泥搅拌桩的施工原理是当桩机深入到设计规定深度,利用桩机的钻头将水泥浆喷入到已经搅动松软的土中,然后利用钻头的高速旋转,将水泥浆和土搅拌均匀,最后形成具有一定加固度的立柱水泥桩,以提高软土基的承载力。
水泥搅拌桩施工工艺流程为清障整理——放线确定桩位——搅拌桩机定位找平——搅拌桩头下沉至施工设计深度——搅拌喷浆并提升钻头——到桩顶即地下0.5m处停止搅拌和喷浆——重复搅拌下沉至施工设计加固深度——提升钻头至预定的位置——关闭搅拌桩机、清理、清洗——进行下一根桩位,重复上述工艺流程。
(1)清障整理:将施工现场清理并压实,清除桩位的地上及地下的障碍例如石块、树根。现场低洼呀填实,现场有水塘等要抽水、清淤;
(2)确定桩位:利用起重机将搅拌桩机吊至指定的桩位对中,如果地面不平,则需要挑整平台基座,使搅拌轴保持垂直,对中的误差要小于1cm,垂直度偏差小于1%;
(3)搅拌桩头下沉:首先启动桩机,松动起吊锁链,待搅拌的钻头运转正常后,将搅拌机沿着做好的导向架搅拌的同时下沉,并达到设计好的位置即水泥搅拌桩必须穿透软土层深入至强度较高的持力层和硬土层。搅拌机下沉和提升的时间要进行书面记录,相差不能超过5秒,需要注意的是,提升前要留出等待送浆至桩底的试件,避免出现提升桩体但却未出浆的现象。
(4)提升钻头:当水泥浆经钻杆喷射搅拌后,要按规定的速度提升钻头,喷浆同时搅拌和提升。当距土层表面0.5m处土层约束较弱,就要停止提升;
(5)重复搅拌下沉:为了保证软土基和固化剂、水泥等搅拌具有,关闭水泥浆泵后,搅拌过程必须要全程复搅即将再次将钻体下沉至设计深度,搅拌提升。只有遇到比较特殊的土质,上报至监理工程师同意后,可以根据实际情况适当减少复搅的长度,但是要将复搅长度、减少原因等作书面记录并要有建立工程师签证认可;
(6)检验:成桩后,必须要对桩进行质量检验,看其是否符合设计要求。根据工程的设计规范,对一定数量的桩体进行开挖检测,包括对其外观的直接观察、水泥浆与土层的搅拌状态、均匀性、强度等,判断其是否符合设计要求。
在上述工艺流程中,需要注意的是:钻体提升会造成管道压力,要防止其压力过大,导致钻孔的淤泥挤压孔壁四周形成空洞;搅拌桩施工中发生意外导致喷浆停止,必须进行补喷,重叠的长度最小不能少于1m;输浆管路要保持通畅,喷湿管要保持湿润,停机三小时以上就要清洗输浆管;桩机的钻头要定期进行检查,其直径的磨损不能大于1cm,最好不要使用超过53cm的钻头等;
总结:现代建筑中,水泥搅拌桩施工尽管技术成熟,但是其工艺性较为复杂,管理较难,包括工艺试验、设备操作人员的技术培训等工作开展不够广泛,设计上考虑不全面等多方面的原因,都会导致某些工程结束后,出现搅拌桩的复合地基出现大的沉降量。只有对于水泥搅拌桩施工严加管理和控制,提高顺搅拌桩施工人员的质量意识,严格遵循设计规范和操作规范等,才能够保证在现代建筑中其施工的高质、经济、合理。
参考文献:
李贵、任福松,水泥搅拌桩施工工艺及操作要点 【J】,油气田地面工程 ,2005(10);
王新、任安乐,公路施工中水泥搅拌桩现场施工技术与管理的几点思考 【J】,城市建设理论研究,2011(28);
李怀述,浅谈水泥搅拌桩的施工技术和质量控制 【J】,工业技术——科技咨询,2007(18);
沈振宇,浅谈水泥搅拌桩施工技术及管理综述 【J】,技术u工程管理,2011(2);
关键字:水泥搅拌桩、施工、施工工艺
Abstract: from the 90 s to the present day, cement mixing pile because of the low prices, mature technology advantages, such as in water conservancy, construction, municipal fields a wide range of applications. It can use a wide range of silt layer rich soft base area, the better to improve the bearing capacity of soft foundation. But the cement mixing pile construction management has a strong particularity, once bad management, also very easy to cause the construction quality defects, must want to strengthen its construction process. This paper of modern architecture of cement mixing piles construction requirements and its construction process to a simple analysis of the paper.
Keyword: cement mixing pile, construction, construction technology
中图分类号:TU525文献标识码:A 文章编号:
水泥搅拌桩技术在我国已经有了几十年的发展历史,通过在我国很多的大型桥梁、河堤、公路等多样的工程中的成功使用,积累了丰富的施工和检测经验,其技术和工艺已经相当成熟。但是尽管施工工艺相对的完善和成熟,但是由于现代建筑对其施工的要求越来越高,其施工技术和工艺也越来越受到了人们的重视,一旦出现问题,很容易导致短桩、断桩。
现代建筑对水泥搅拌桩施工的要求
现代建筑对水泥搅拌桩施工的要求即在施工过程中对其的质量等方面控制,主要有以下几方面:
(1)施工前,从事喷桩施工的人员必须是经过技术交底,并且桩机的操作员和送灰工必须有专业证,开工前,必须进行及时较低,并有书面记录,还要制定岗位职责和桩机的操作规范;
(2)所有进入到施工现场的桩机等设备都要有出厂合格证,并且配有电子记录仪器,禁止无记录仪的桩机投入使用;
(3)水泥攪拌桩施工前,以桩基布置图为依据测量放样,得到的测量结果汇总后上报监理单位,确认后才可进行施工;
(4)水泥搅拌桩所用的水泥等材料要符合设计要求,进场的材料都需要提前送检,检测合格后才能够投入施工,并且每根桩的水泥只能使用同种品牌,不能够混用;
(5)施工中,在压浆阶段不能够出现断浆现象,保持输浆管路的畅通,禁止发生堵塞,严格按照设计数据操作,控制喷浆和搅拌的速度,保证其加固的强度及连续;
(6)要保证每寸加固范围都要充分搅拌,控制好重复搅拌的速度;要保证起重机的平稳性,保证搅拌桩垂直于地面。支护和各税结构为水泥土搅拌桩的,要保证加固体的连续,相邻的加固体施工间隔小于24小时;
(7)在施工时,如果桩的长度都是统一的数值,可以根据单根桩所需要的水泥浆分一次或者两次进行拌制,保证所用水泥浆的准确配合比,每根桩的水泥浆都充足且均匀。当桩的长度比较短时,可以根据单根桩所需要的水泥浆一次拌制2到3根桩所用的水泥浆,并且在水泥浆罐壁上可以标记单根桩所用的水泥浆的用量刻度线;
(8)对于施工过程中的桩机的具体施工情况,必须要求分台分责管理,要有专门的工作人员进行记录:在值班期间每台桩机的运行是否正常、是否发生机械损坏现象、维修保养时间、维修后的开工时间、是否发生无故停机现象、停机时间、开机时间等。
(9)施工中要避免污染环境,禁止造成施工范围以外的其他建筑物的稳定性的破坏;保护施工现场四周的植物等;做好排水工作,对周边的河水、水田等保持清洁;禁止将施工产生的废水、废料随意倾倒或者直接倒入水塘等;完工后要及时清理施工场地,废渣、废料倾倒在规定的垃圾场;
二、水泥搅拌桩的施工工艺
水泥搅拌桩的施工原理是当桩机深入到设计规定深度,利用桩机的钻头将水泥浆喷入到已经搅动松软的土中,然后利用钻头的高速旋转,将水泥浆和土搅拌均匀,最后形成具有一定加固度的立柱水泥桩,以提高软土基的承载力。
水泥搅拌桩施工工艺流程为清障整理——放线确定桩位——搅拌桩机定位找平——搅拌桩头下沉至施工设计深度——搅拌喷浆并提升钻头——到桩顶即地下0.5m处停止搅拌和喷浆——重复搅拌下沉至施工设计加固深度——提升钻头至预定的位置——关闭搅拌桩机、清理、清洗——进行下一根桩位,重复上述工艺流程。
(1)清障整理:将施工现场清理并压实,清除桩位的地上及地下的障碍例如石块、树根。现场低洼呀填实,现场有水塘等要抽水、清淤;
(2)确定桩位:利用起重机将搅拌桩机吊至指定的桩位对中,如果地面不平,则需要挑整平台基座,使搅拌轴保持垂直,对中的误差要小于1cm,垂直度偏差小于1%;
(3)搅拌桩头下沉:首先启动桩机,松动起吊锁链,待搅拌的钻头运转正常后,将搅拌机沿着做好的导向架搅拌的同时下沉,并达到设计好的位置即水泥搅拌桩必须穿透软土层深入至强度较高的持力层和硬土层。搅拌机下沉和提升的时间要进行书面记录,相差不能超过5秒,需要注意的是,提升前要留出等待送浆至桩底的试件,避免出现提升桩体但却未出浆的现象。
(4)提升钻头:当水泥浆经钻杆喷射搅拌后,要按规定的速度提升钻头,喷浆同时搅拌和提升。当距土层表面0.5m处土层约束较弱,就要停止提升;
(5)重复搅拌下沉:为了保证软土基和固化剂、水泥等搅拌具有,关闭水泥浆泵后,搅拌过程必须要全程复搅即将再次将钻体下沉至设计深度,搅拌提升。只有遇到比较特殊的土质,上报至监理工程师同意后,可以根据实际情况适当减少复搅的长度,但是要将复搅长度、减少原因等作书面记录并要有建立工程师签证认可;
(6)检验:成桩后,必须要对桩进行质量检验,看其是否符合设计要求。根据工程的设计规范,对一定数量的桩体进行开挖检测,包括对其外观的直接观察、水泥浆与土层的搅拌状态、均匀性、强度等,判断其是否符合设计要求。
在上述工艺流程中,需要注意的是:钻体提升会造成管道压力,要防止其压力过大,导致钻孔的淤泥挤压孔壁四周形成空洞;搅拌桩施工中发生意外导致喷浆停止,必须进行补喷,重叠的长度最小不能少于1m;输浆管路要保持通畅,喷湿管要保持湿润,停机三小时以上就要清洗输浆管;桩机的钻头要定期进行检查,其直径的磨损不能大于1cm,最好不要使用超过53cm的钻头等;
总结:现代建筑中,水泥搅拌桩施工尽管技术成熟,但是其工艺性较为复杂,管理较难,包括工艺试验、设备操作人员的技术培训等工作开展不够广泛,设计上考虑不全面等多方面的原因,都会导致某些工程结束后,出现搅拌桩的复合地基出现大的沉降量。只有对于水泥搅拌桩施工严加管理和控制,提高顺搅拌桩施工人员的质量意识,严格遵循设计规范和操作规范等,才能够保证在现代建筑中其施工的高质、经济、合理。