秦皇岛港煤码头二期工程是我国利用外资贷款建设的重点建设工程。年通过能力为2000万吨,配备有现代化的进口机械设备,有两个5万吨级深水泊位。预计今年年底建成投入使用。投产后与现已投产的煤一期工程一起年通过能力为3000万吨,是一座煤炭输出专用码头,工程全部竣工投产以后,将与现在正在抓紧施工的京秦电气化铁路相配套。为我国北煤南运,煤炭外贸出口,发展
The second phase project of Qinhuangdao Port Coal Terminal is a key construction project of utilizing foreign loans in our country. The annual capacity of 20 million tons, equipped with modern imported machinery and equipment, there are two 50,000-ton deep water berths. It is estimated that put into use by the end of this year. After put into production with the first phase of the project has been put into operation with an annual capacity of 30000000 tons, is a coal output for the wharf, the project completed and put into operation, it is now close to the construction of the Beijing-Qinhuangdao Railway electrification matching. For our northern coal south transport, coal exports, development