论文部分内容阅读
新疆新源县电力发展是从1958年开始起步的。1968年卡普河三级水电站建成发电,1985年,卡普河四级水电站投产,同年,成立发供合一的县水电公司。1995年,县火电厂竣工发电。改革开放以来,特别是90年代新源县实施全国第二批农村水电初级电气化试点县建设,全县电网建设取得长足的发展,新建和改建了一大批变电所和输配电线路,基本形成了一个布局合理、水火互补的县级地方独立电网。截至1999年底,网内水火电装
Xinjiang Xinyuan County power development started from 1958. In 1968, the Karp River’s third-level hydropower station was built to generate electricity. In 1985, the Kapu River IV hydropower station was put into operation. In the same year, the county hydropower company that issued the unity was established. In 1995, the county’s thermal power plant completed its power generation. Since the reform and opening up, especially in the 90s, Xinyuan County implemented the second batch of rural electrification pilot electrification counties in rural areas. The construction of the county’s power grid has made considerable progress. A large number of substations and transmission and distribution lines have been newly built and reconstructed. A county-level local independent power grid with a reasonable layout and complementary hydropower. As of the end of 1999, the network of hydroelectric power equipment