Analysis Model on Penetration Depth of Concrete by Eroding Long-Rod Projectiles

来源 :北京理工大学学报(英文版) | 被引量 : 0次 | 上传用户:JINZI1975
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Mass loss should be considered while calculating the penetration depth of concrete by eroding long-rod projectiles of high velocity. The penetration process is divided into two phases: eroding phase and rigid phase. During eroding phase, a model to predict the penetration depth is established on the assumption that there is a chipping region in the bottom of crater. During rigid phase, Forrestal formula is adopted to calculate the penetration depth. Using this model, the depth of concrete penetration by a tungsten alloy long-rod projectile is calculated. When the critical eroding velocity is between 950 m/s and 1 000 m/s, the result is in good agreement with the experimental data.
其他文献
新疆是一个多民族聚居的地区。不同民族、不同语言长期接触和相互影响产生了语言兼用和语言转用现象,使新疆成为双语和多语共存区域。探讨和研究新疆少数民族地区双语和多语
21世纪是知识和信息资讯爆炸的E时代.传统的教师培训模式由于其固有的矛盾,已不能适应E时代的需要,基于网络的e-Learning培训模式具有与时俱进性、人本性、主体性、过程性等
目的掌握西昌试区沟渠钉螺的分布特点.方法用全球定位系统(GPS)和地理信息系统(GIS)绘制的沟渠地图指导查螺,采用系统抽样法查螺,框距10 m,压碎法检查钉螺血吸虫感染情况,并
介绍了一块Φ520mm大相对孔径(F/1.6)轻量化椭球面反射镜的加工与检测方法。镜面的有效口径为Φ502mm,顶点曲率半径为1600mm,非球面系数k=-0.9663,面形精度要求优于0.025λ(R
本文旨在讨论考试的科学属性,并结合高校英语专业四、八级考试大纲(2004年新版)的修订,探讨如何认识和提高考试的科学属性。
白蚁管涌(漏)与水利管涌是两个完全不同的概念,而水利工程技术人员往往将其混淆起来,统称为水利管涌进行处理.本文则以大量的事实真相论述它们的区别和不同的处理方法,结论是
DCMI维护着一个包含众多元数据术语的词表,其中最主要的是包括15个元素的都柏林核心。然而,DCMI 所关注和讨论的并不只是这个核心集,以及围绕这个核心集的实践、策略和模型,D
介绍动态 (电位 )法测定煤层压裂裂缝方位、长度等参数的测试技术 ,它是针对煤层的固有特点 ,在室内进行大量物理模型试验 ,结合现场试验后取得的科研成果。文中简要阐述动态
Pricing the American put options requires solving an optimal stopping problem and therefore is a challenge for the setting up of simulation parameters. This pap
The explosive growth of the Internet and database applications has driven database to be more scalable and available, and able to support on line scaling without interrupting service. To support more