论文部分内容阅读
Rock slope stability is of great concern along highway routes as stability problems on cut slopes may cause fatal events as well as loss of property.In rock slope engineering,stability evaluations are commonly performed by means of analytical or numerical analyses,principally considering the factor of safety concept.As a matter of fact,the probabilistic assessment of slope stability is progressively getting popularity due to difficulties in assigning the most appropriate values to design parameters in analytical or numerical methods.Additionally,the effect of heterogeneities in rock masses and discontinuities on the analysis results is minimized through the probabilistic concept.In this study,slope stability of high and steep sedimentary rock cut slopes along a state highway in AdilcevazBitlis(Turkey) was evaluated on the basis of probabilistic approach using the Slope Stability Probability Classification(SSPC) system.The probabilistic assessment indicates major slope stability problems because of discontinuity controlled and discontinuity orientation independent mass movements.Almost all studied cut slopes suffer from orientation-independent stability problems with very low stability probabilities.Additionally,the probability of planar and toppling failures issignificantly high with respect to the SSPC system.The stability problems along the investigated rock slopes were also verified by field reconnaissance.Remedial measures such as slope re-design and reinforcement at the studied locations should be taken to prevent hazardous events along the highway.On the other hand,the probabilistic approach may be a useful tool during rock slope engineering to overcome numerous uncertainties when probabilistic and analytic results are compared.
Rock slope stability is of great concern along highway routes as stability problems on cut slopes may cause fatal events as well as loss of property. In rock slope engineering, stability evaluations are generally performed by means of analytical or numerical analyzes, principally considering the factor of safety concept. As a matter of fact, the probabilistic assessment of slope stability is progressively getting popularity of to difficult in assigning the most appropriate values to design parameters in analytical or numerical methods. Additionally, the effect of heterogeneities in rock masses and discontinuities on the analysis results is minimized through the probabilistic approach. this study, slope stability of high and steep sedimentary rock cut slopes along a state highway in Adilcevaz Bitlis (Turkey) was evaluated on the basis of probabilistic approach using the Slope Stability Probability Classification (SSPC) system . The probabilistic assessment indicates major slope stability problem s because of discontinuity controlled and discontinuity orientation independent mass movements. Almost all studied cut slopes suffer from orientation-independent stability problems with very low stability probabilities. Additionally, the probability of planar and toppling failures issignificantly high with respect to the SSPC system. relying on the investigated rock slopes were also verified by field reconnaissance.Remedial measures such as slope re-design and reinforcement at the study locations should be taken to prevent hazardous events along the highway .On the other hand, the probabilistic approach may be a useful tool during rock slope engineering to overcome numerous uncertainties when probabilistic and analytic results are compared.