论文部分内容阅读
在水利工程建设中,渡槽广泛采用简支梁与双悬臂梁式。为了增大渡槽的跨度,求得经济合理,我们曾设计和建筑了以下几种静定多跨梁的槽身结构形式(如图1)。
In the water conservancy project construction, the aqueduct widely used simple supported beam and double cantilever beam type. In order to increase the span of the aqueduct and to be economically reasonable, we have designed and constructed the following forms of the body structure of the statically-rated span beam (Figure 1).