介绍了考虑施工进度等因素,预制箱梁预制场在横桥向设置的情况下,如何解决横桥向移梁、上梁临时墩的设计及横移变纵移的转换。
This paper introduces how to solve the design of transversal girder and upper pier temporary pier and the transversal shift of the precast box girder prefabricated by the horizontal bridge when considering the construction schedule and other factors.