论文部分内容阅读
我省的抗震加固工作,在1976年唐山地震以后开展起来,抗震加固工作是深受群众欢迎的一件大好事情。但在施工过程中,由于工序的衔接等问题,有时不得不多次进出住户,给居民增加了麻烦,如何作到不进家门或减少对住户的干扰及提高工效,这不仅是广大住户的强烈愿望,也是施工单位广大职工的要求。随着抗震加固技术的发展和进步,在GC01、GC02标准图中的一些节点和作法,已不能满足要求,于是各种锚杆在抗震加固工程中,就应需而生。
The seismic strengthening work in our province was carried out after the Tangshan earthquake in 1976. Seismic reinforcement work was a great thing that was welcomed by the masses. However, in the construction process, due to problems such as the convergence of processes, it is sometimes necessary to enter and leave households several times, which increases the troubles for the residents, how to avoid entering the house or reduce the interference with the households and improve the work efficiency. This is not only the strong The desire is also the requirement of the construction staff. With the development and progress of anti-seismic reinforcement technology, some of the nodes and practices in the GC01, GC02 standard drawings have failed to meet the requirements, so various kinds of anchor rods were born in anti-seismic reinforcement projects.