阐述了镇海、龙湾燃气轮机电站的燃气轮机组在启动试运过程中所暴露的启动FSR值不合理、重/轻油切换不稳定、保护动作跳机等一系列关键问题 ,对此进行了技术分析 ,并结合现场实际加以改进和完善 ,提高了机组的技术性能和运行水平。
This paper expounds a series of key problems such as unreasonable starting FSR values, instability of heavy / light oil switchover and protection action trip of gas turbine units of Zhenhai and Longwan Gas Turbine Power Station during the start-up trial operation, Combined with the actual site to be improved and improved to improve the technical performance of the unit and operating level.