1998年 7月加拿大安大略电力公司公布了 5月份达林顿核电站 1— 4号机组运行情况 ,现摘要报道如下 :1.公众安全项 目 5月份达到的值目标值运行情况·运行综合指数 (9个工业标准综合指数 % ) 55.4 52 .5好于目标值·向加拿大核管局申报的事件 36 53好于目标值·未满足公众
In July 1998, Canadian Ontario Electric Power Company announced the operation of Units 1 to 4 of the Darlington Nuclear Power Plant in May. The summary report is as follows: 1. Public safety project value reached in May Target operating conditions Operational comprehensive index (9 Industry Standard Composite Index % ) 55.4 52 .5 Better than the target value • The event reported to the Canadian Nuclear Authority 36 53 Better than the target value · Not meeting the public