论文部分内容阅读
举世瞩目的长江三峡工程于 1 994年 1 2月正式开工 ,安装 2 6台 70 0MW水轮发电机组 ,计划 2 0 0 3年第一批机组发电 ,2 0 0 9年建成 ,是一项跨世纪的宏伟工程。由于三峡工程自然条件和以防洪为主的需要 ,电站运行水头变幅大 ,增加了机组设计制造的难度 ,要求机电设备运行可靠 ,技术先进。国内制造部门、科研院所与高等院校密切合作 ,开展科技攻关 ,消化吸收引进先进技术 ,必将推动我国机电工业技术水平的提高和发展
The Yangtze River Three Gorges Project, which attracted worldwide attention, was officially started in January 1994 and installed 26 70-MW turbines and plans to generate the first batch of generating units by 2003 and completed in 2009, The grand project of the century. Due to the natural conditions of the Three Gorges Project and the need of flood control, the head of the power station fluctuates greatly, which increases the difficulty of unit design and manufacture, and requires the operation of electromechanical equipment to be reliable and technologically advanced. Domestic manufacturing departments, research institutes and institutions of higher learning in close cooperation to carry out scientific and technological research, digestion and absorption of imported advanced technology, will certainly promote China’s mechanical and electrical industry to enhance the technological level and development