论文部分内容阅读
本文介绍了新钢600m~3高炉水管头折断的判断和对已断水管头的修复及未断水管头的预防性处理方法。
This paper introduces the judgment of the breakage of the water pipe head of the 600m ~ 3 blast furnace in Xinsteel and the preventive treatment of the repaired water pipe head and the unheated pipe head.