论文部分内容阅读
在党中央毛主席的英明领导下,由于省、地委的正确领导,我区水电建设有了飞跃地发展。截至目前止共兴修水力、水电站992座,装机容量可达9,777瓩。所建的站都是水力加工与水力发电两用。已经装上电机的有55座,容量2,140瓩,进行120多项农副产品加工,安装加工机器5,253台。现在全区已经有45%的公社利用了水力加工。有53个公社、5万余户安装了电灯7万余盏,实现了照明电气化。开始时抓住了建站,对管理注意不够,
Under the wise leadership of Chairman Mao’s Chairman Mao, due to the correct leadership of the provincial and prefectural committees, hydropower construction in our region has developed leaps and bounds. Up to now, the company has built hydropower stations and 992 hydropower stations, with an installed capacity of 9,777 瓩. The stations built are both hydraulic and hydroelectric. 55 electric motors have been installed and the capacity is 2,140瓩. More than 120 agricultural and sideline products have been processed, and 5,253 sets of processing machines have been installed. Nowadays, 45% of the communes in the region have used hydraulic processing. In 53 communes and more than 50,000 households, more than 70,000 electric lights were installed to achieve lighting electrification. At the beginning, he seized the site and did not pay enough attention to management.