论文部分内容阅读
二滩水电站拱坝标 (Ⅰ标 )合同内的金属结构安装工程量大 ,安装工期集中。为保证工程质量 ,监理工程师采取了有效的监理措施 ,协调好业主和承包商之间的关系 ,从而确保了整个Ⅰ标金属结构安装工作的顺利进行
Ertan Hydropower Station arch dam standard (Ⅰ standard) the contract within the metal structure installation works, installation time is concentrated. In order to ensure the quality of the project, the supervising engineer has taken effective supervision measures to coordinate the relationship between the owner and the contractor so as to ensure the smooth progress of the installation of the whole Ⅰ-grade metal structure