在用组合钢模板支设墙板模板时,都按组合设计布置穿墙螺栓。安装穿墙螺栓必须在钢模板上钻孔,施工完毕后再把孔补焊磨平,以备再用,这是组合钢模的常规施工方法。但这种方法影响钢模板的使用寿命,由于多次钻孔、补焊、整平,变形越来越大,最后超过规范要求,只得报废。按规定周转次数不得少于50次的钢模只周转几次或十几次就提前报废了,造成很大浪费。我们在工程实践中是按以下方法做到穿墙螺栓不穿钢模的: 在墙板支模时,模板底面都用水泥砂浆
When using the composite steel formwork to support the wallboard formwork, the throughwall bolts are arranged in a combined design. Installation through the wall bolt must be drilled on the steel formwork, after the completion of the construction of the hole repair welding ground, ready for reuse, which is the conventional construction method of the combined steel mold. However, this method has affected the service life of the steel formwork. Due to multiple drillings, welding repairs, and leveling, the deformation has become more and more severe. At the end, it exceeded the specification requirements and had to be scrapped. The steel molds that are not less than 50 times in accordance with the regulations shall only be scrapped in advance if they are turned several times or dozens of times, resulting in great waste. In engineering practice, we use the following methods to do wall bolts without using steel molds: In the wall panel mold, the bottom of the template is used cement mortar