论文部分内容阅读
中核总1998年度工作会议强调,今年要调动一切积极因素,重点打好企业解困和核电工程建设两大攻坚战。现在时间过半,这两大任务均取得了较好的战绩。企业在东南亚金融危机和国内产业结构调整的情况下,运营情况还略好于去年同期;参与核电建设的广大干部、职工,战严寒、斗酷暑,基本保障了工程的顺利进展。然而,核电建设的任务仍然十分艰巨,我们决不能掉以轻心。“九五”期间国家安排建设的四个核电项目八台机组,技术差异较大,合作对象不
The 1998 annual meeting of the China Nuclear Corps emphasized that this year we must mobilize all positive factors and focus on the fight against difficulties and the construction of nuclear power projects. Now more than half of the time, these two major tasks have achieved a good record. Under the circumstances of the Southeast Asian financial crisis and the adjustment of the domestic industrial structure, the company’s operations were slightly better than the same period of last year. The vast number of cadres and employees involved in the construction of nuclear power had been fighting the cold and fighting the heat, basically guaranteeing the smooth progress of the project. However, the task of nuclear power construction is still very arduous. We must not take it lightly. During the “Ninth Five-Year Plan” period, the eight nuclear power generating units that the country arranged for construction have a large difference in technology, and the target of cooperation is not