斜拉桥地震响应非线性时程分析

来源 :西南交通大学学报 | 被引量 : 0次 | 上传用户:zhangliu2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
基于有限单元法 ,推导出多自由度结构体系在地震作用下的增量形式的运动方程 ,建立了大跨度斜拉桥的地震激励模型。考虑结构的几何非线性 ,采用增量动力平衡迭代格式的Newmark β法进行非线性时程分析 ,并以某主跨 36 0m的斜拉桥为例进行了线性、非线性动力分析 ,验证了方法的可行性 ,同时表明大跨度斜拉桥的几何非线性影响因素不容忽视 Based on the finite element method, the incremental equations of motion for a multi-degree-of-freedom structural system under earthquake action are derived, and the seismic excitation model for long-span cable-stayed bridges is established. Taking the geometrical nonlinearity of the structure into account, the Newmark β method of incremental dynamic equilibrium iteration scheme is used to conduct the nonlinear time history analysis. The linear and nonlinear dynamic analysis of a 3600m cable-stayed bridge with a main span is conducted to verify the method The feasibility of this method is also demonstrated. The factors that influence the geometric nonlinearity of long-span cable-stayed bridges can not be ignored
其他文献
“暴走族”这个名词传入中国,也就几年光景,但很快就成为了时尚界的新成员。我国的暴走族跟国外的暴走族有很大不同,国内的暴走可以解释为一种简易可行的户外疾行运动或探险
介绍了末煤重介选工艺中脱介筛分级粒度对介耗的影响,分析了改变常规的脱介筛分级粒度、强化粗煤泥回收、增加重介系统内部循环水对有效降低系统介耗、降低生产成本的技术支
我们仿佛看见一团火,在燃烧中温暖着无数人充满酸甜苦辣的返乡之旅。春节,在寒冷的冬天与温暖的春天之间交替的特别日子,就是这群安监人,一刻也不敢放松,为了节日的祥和与安
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
针对风力机桨距角传感器输出偏移故障,提出一种基于多新息卡尔曼滤波算法的故障诊断方法。根据风力机机械结构特点,将桨距角的变化与风力机塔受力产生的微小位移建立对应关系。采用多新息卡尔曼滤波算法减小传感器输出信息中的噪声,提高了滤波算法的收敛速度和估计精度,得到较为精确的风力机塔微小位移估计值。由微小位移的变化检测出故障是否产生,并依据位移变化大小估算角度偏移量。仿真结果表明:所提出的故障诊断方法能够有
期刊
简要介绍了联合站的构成,阚述了对联合站进行安全评价的必要性,提出采用模糊安全综合评价对联合站进行安全性评价的方法和步骤.
为解决作业车间生产批量优化问题,在考虑企业资金收益率最大化的情况下以生产过程时间最短为优化目标,给出了理想条件下关于生产批量的生产过程时间模型,并据此推导出求解理论最优生产批量的算式。针对数学建模理想化假设的局限性,借助e M_plant仿真软件对作业车间实际生产运作情况进行仿真建模,并根据生产批量优化策略对仿真模型进行优化。通过运行优化后的仿真模型修正理论最优生产批量,从而提高最优解的可行性。经
最近,国家标准化管理委员会批准发布了GB3445-2005《室内消火栓》国家标准第1号修改单,于2009年5月1日起实施。GB3445标准修改单内容如下:在5.2条中增加一款:“5.2.6旋转型室