龙溪河的第四个梯级电站——下硐水电站是去年8月15日开工的,自从工区党总支于3月1日召开了生产跃进大会以后,各單位代表紛紛提出自己的跃进指标,并把上級要求的发电日期(7月15日)再提前半个月,用第一台机组发电来庆祝偉大的中国共产党的生日。生产跃进大会的决議成为全体3,000多名职工行
The Xiahe Hydropower Station, the fourth-stage hydropower station of the Longxi River, was started on August 15 last year. Since the general Party branch of the construction area convened a production leap forward on March 1, various units representatives have proposed their own leap-forward targets. And the power generation date (July 15th) required by the superior was advanced two weeks ahead of schedule. The first unit was used to generate electricity to celebrate the birthday of the great Chinese Communist Party. The resolution of the production leap forward assembly became the entire 3,000 employees