伫立于百年城雕往南眺望,建设中的跨海大桥如长虹卧波,令人期待。由大连市星海湾开发建设管理中心承建的这项工程,就是为了缓解中山路、高尔基路、旅顺南路、高新园区的路堵问题,特别是缓解大连西部交通压力,在不影响生态环境的情况下,向大海要一段通途。南部滨海跨海大桥于2011年10月10日正式开工。大桥全长约6公里,双层双向八车道,是国内首座海上地锚悬索式跨海大桥。大桥按照能承受百年一遇风浪设计,抗震按照地震烈度7度设防,大桥建成后,在我国海上
Standing in the centenary city sculpture overlooking the south, the building of the sea bridge such as Changhong lying wave, it is looking forward to. This project, constructed by Dalian Xinghai Bay Development and Construction Management Center, aims to ease the traffic congestion in Zhongshan Road, Gorky Road, Lushun South Road and High-tech Park, and especially to ease the traffic pressure in western Dalian. Without affecting the ecological environment , To the sea to have a thoroughfare. The southern coastal bridge on October 10, 2011 officially started. Bridge length of about 6 km, double two-way eight lanes, is the first offshore ground anchor rope bridge. Bridge in accordance with the storm can withstand a hundred years design, seismic intensity in accordance with the earthquake seven degrees fortification, the completion of the bridge in our country at sea