最近国家计委提出1996年国家固定资产投资为2万亿元,其中建筑安装工程投资在60%以上,约占1.2万亿元,要求固定资产投资完成率达到70%。固定资产投资完成率在建筑安装工程中表现为竣工率,工程竣工以后,才能形成固定资产,投入使用,产生新的效益。从当前的实际情况看,距离这个要求不是很小而是相当大。以北京市为例,“八五”期间建筑安装工程竣工率完成情况是:1991年竣工率为36.7%,平均工期2.7年;1992年竣工率为35.5%,平均工期2.8年;1993年竣工率为32%,平均工期为3.1年;1994年竣工率为30.7%,平均工期为3.3年;1995年竣工率为28.1%,平均工期为
Recently, the State Development Planning Commission proposed that the national fixed asset investment in 1996 be 2 trillion yuan, of which construction and installation projects will be invested at more than 60%, accounting for about 1.2 trillion yuan, and the completion rate of investment in fixed assets will reach 70%. The completion rate of fixed assets investment shows the completion rate in the construction and installation projects. After the completion of the project, the fixed assets can be formed and put into use, resulting in new benefits. From the current actual situation, the distance requirement is not very small but rather considerable. Taking Beijing as an example, the completion rate of the construction and installation project during the “Eighth Five-Year Plan” period was: the completion rate was 36.7% in 1991, the average construction period was 2.7 years; the completion rate in 1992 was 35.5%, and the average construction period was 2.8 years; 1993 The rate of absenteeism was 32% with an average duration of 3.1 years; in 1994 the rate of completion was 30.7%, the average duration was 3.3 years; in 1995 the rate of completion was 28.1%, and the average duration was