论文部分内容阅读
水电部水利水电建设总局委托陕西机械学院水电科研所和浙江省水电工程局共同研制的沥青混凝土斜墙大型摊铺机于1985年5月制成样机,随即投入浙江省牛头山水库砂砾石坝沥青混凝土防渗斜墙的施工,1985年8月进行了现场技术性能测试,截止1987年4月已完成沥青混凝土外墙铺设面积约3000平米.两年的施工实践证明该项目的研制是成功的.1987年6月由水电部建设总局会同浙江省水利厅主持在浙江省临海市召开了该科研成果评审会.参加会
Ministry of Water Resources and Hydropower Construction Bureau commissioned by Shaanxi Institute of Hydraulic and Hydroelectric Engineering Research Institute of Zhejiang Province, jointly developed asphalt concrete inclined wall large paver made in May 1985 a prototype, and then into Zhejiang Province Toutoushan Reservoir gravel dam asphalt The construction of concrete seepage-proof sloping wall was carried out on-site technical performance test in August 1985. As of April 1987, the laying area of asphalt concrete exterior wall has been completed to about 3000 square meters and the construction practice for two years proved that the project was successfully developed. June 1987 by the Ministry of Construction and the Ministry of Water Conservancy, Zhejiang Province, hosted by the Department of Water Resources in Linhai City, Zhejiang Province held a review of scientific research.