Response of the distributary channel of the Huanghe River estuary to water and sediment discharge re

来源 :Chinese Journal of Oceanology and Limnology | 被引量 : 0次 | 上传用户:libowen1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The water and sediment discharge regulation(WSDR) project,which has been performed since 2002 before flood season every year,is of great significance to the river management in China.Until 2007,six experiments have been fulfilled to evaluate the effect of the project on the natural environment.To fill the gap of investigations,a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe(Yellow) River was conducted during the WSDR project period in 2007.The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir.Within four days after the flood peak at 3 000 m3/s entered the distributary,the channel in the river mouth area was eroded quickly.Both the mean values of area and depth of the main channel were tripled,and the maximum flood carrying capacity increased to 5 500 m3/s or more.Then,the river channel was silted anew in a very short time after completion of the WSDR.Favored by the WSDR project,the river status in April 2008 became better than that of the year before.The adjustment ranges of main channel parameters were about 30%,10%,and 10% at sections C2,Q4,and Q7,respectively.The process of rapid erosion-deposition was more active 15 km away in the channel from the river mouth due to the marine influence.It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak.As a result,the sediment peak reached the river mouth about two days later than that of the water current.In addition,the WSDR project has improved the development of the estuarine wetland.Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability.It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods,because at the rate the water in the wetland would be stored and replenished in balance.Moreover,we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland.These activities should achieve the Huanghe River management strategy of “To concentrate flow to scour sediment,stabilize the main channel,and regulate water and sediment”. The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Unl 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir.Within four days after the flood peak at 3 000 m3 / s entered the distributary, the channel in the river mouth area was eroded quickly.Both the mean values ​​of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3 / s or more. Shen, the river channel was silted ane w in a very short time after completion of the WSDR. Favor by the WSDR project, the river status in April 2008 as better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10 % at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the river mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3 / s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored andreplenished in balance.Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of “To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment ”.
其他文献
男性慢性肝炎和乙肝后肝硬变患者性功能和血清性激素水平的变化陈从新,周永兴,陈 曲(唐都医院传染病科西安710038合肥105医院)关键词病毒性肝炎;肝硬变;性行为;性激素中图号R512.6有关男女肝脏疾病
消化性溃疡是一种慢性疾病,具有自然缓解和反复发作的特点。近年来对消化性溃疡病的自然史有进一步的了解:第一是内镜的应用,使溃疡得到更好的确认;第二是安慰剂作对照的临
本研究旨在确定正规三联疗法后幽门螺旋菌(HP)再感染率及证实影响复发的临床因素。 方法:治疗前受试者胃窦活检组织经CLO试验和/或银染色以及~(13)C-尿素呼吸试验证实有HP感
一前言中国自古即有“活到老,学到老”的格言。还有不少国家也有类似说法。迄至本世纪觎年代以来,经有关学者和国际组织的研究和倡导,已开始形成为终生教育和学习社会的国际思潮
国有企业改革推行在即。由于国有企业负责人具有行政级别,其中一项调研内容是,企业负责人是否愿意放弃行政级别,变身体制外,获取更高的报酬,“99%的50岁以上的国企负责人都不
作为灾害性空间天气的一种重要志源——日冕物质抛射(CME),一直是空间物理学家关注和研究的热点;另一方面,做为空间天气的最直接表现的层次——近地空间环境,随着地基探测手
当前,中小企业生存环境不容乐观,主要面临着融资贵、用工难和税负重问题。融资贵,这是长期困扰中小企业的老问题。尤其是在经济增速趋缓的今天,银行等金融机构对放贷更加谨慎
[摘要] 文章回顾了为人民服务思想提出的历史过程,阐述了为人民服务思想在党的历史发展中的重要作用,得出为人民服务是共产党人永恒主题的重要结论。  [关键词] 毛泽东;为人民服务;宗旨  [中图分类号] A84 [文献标识码] A [文章编号] 1007-1962(2004)17-0015-03    在纪念毛泽东《为人民服务》著作发表60周年之际,为坚持党的宗旨,继承和发
党的十四届六中全会审议并通过了《中共中央关于加强社会主义精神文明建设若干重要问题的决议》。明确提出了社会主义精神文明建设的指导思想、目标任务、工作方针和重大措
自人胎肝中提取得肝细胞刺激物质(HSS),分别建立了检测HSS含量、抗HSS自身抗体(HSS-Ab)、HSS特异免疫复合物(HSS-IC)的ELISA法。免疫组化研究证实,HSS存在于人胎肝以及肝病患者的肝细胞浆内,但正常成人肝细胞中为阴性。