一、概况上海冶炼厂铜阳极泥处理车间于1958年建成,采用焙烧锅及马弗炉进行铜阳极泥硫酸化焙烧及蒸馏提硒,脱铜浸出渣进入贵铅炉及分银炉进行火法冶炼,产出金银合金,然后将金银合金进行银电解精炼及金电解精炼,分别产出电银和电金。此外还从金电解废液中回收铂族元素,提取海绵铂及海绵钯。由于,劳动条件差,生产效率低,于1966年开始对铜阳极泥车间的主要设备进行了改
I. Overview Shanghai Smelter copper anode mud treatment plant was completed in 1958, the use of roasting pan and muffle furnace copper anode slime sulfation roasting and distillation to selenium, copper removal leaching residue into your lead furnace and sub-silver furnace fire method Smelting, the output of gold and silver alloy, and then silver and silver alloy electrolytic refining and electrolytic refining, respectively, the output of silver and gold. In addition, the platinum group elements are recovered from the gold electrolysis waste liquid to extract sponge platinum and sponge palladium. Due to poor working conditions and low production efficiency, the main equipment of the copper anode slime plant was changed in 1966