由于T23钢抗拉强度在550℃时达到87MPa,超临界机组再热器及屏式过热器管件经常用T23钢代替T91钢,但是T23钢δ较高,所以管件一般需进行强力对口,焊口应力集中倾向严重,若施工时采用的工艺不当,可能在s焊后热处理时造成焊趾处开裂。为使T23焊口工艺性能优良,施工中及运行时不再发生开裂现象,本文对T23钢性能及焊接工艺进行了分析与研究,提出合理的过程控制措施,以避免电力建设工程发生类似质量事故。
T23 steel tensile strength at 550 ℃ reached 87MPa, supercritical unit reheater and screen superheater tube often use T23 steel instead of T91 steel, but T23 steel δ higher, so the pipe is generally required for strong counterparts, weld Stress concentration is serious, if the construction process used improperly, may cause weld toe cracking after s welding heat treatment. In order to make the T23 welding mouth excellent process performance, no crack occurred during construction and operation, this paper analyzes and studies T23 steel performance and welding process, puts forward reasonable process control measures to avoid similar quality accidents in power construction projects .