价格调整对于建设期较长的工程项目是经常遇到的,国际上通用的调整方法为:基于价格法和基于指数的两种价格调整方法。由于项目在建设周期内经常会遇到工程所在国政策、法令和法规的调整,以及汇率变化、物价涨跌等原因导致了工程价格的变化。文章以刚果(金)非行LOT1/2标公路项目价格调整为实例,阐述价格调整中实际遇到的问题,分析合同中应注意的有争议条款,完善合同管理,减少和避免合同纠纷的发生。
Price adjustment for the construction of longer construction projects are often encountered, the international common adjustment method: based on the price method and index-based two price adjustment methods. As the project often encountered in the construction period of the host country policy, statutory and regulatory adjustments, as well as changes in exchange rates, price changes and other reasons led to changes in engineering prices. This article takes the adjustment of the price of DRC LOT1 / 2 standard highway project as an example, expounds the problems actually encountered in the price adjustment, analyzes the controversial clauses that should be noticed in contracts, improves the contract management, and reduces and avoids the occurrence of contract disputes.