论文部分内容阅读
过去选择各类水电站的装机容量,常采用“保证出力倍比法”、“年利用小时数法”或“抵偿年限法”等。本文试图以“最大经济效益”为主要指标的分析方法,来合理地选择无调节小型水电站的最优装机容量,供参考。要使装机容量合理,电站达到最大经济效益,首先须分析影响电站经济效益的因素。电站建设投资是影响电站经济效益的第一个因素,它和装机容量有密
In the past to choose various types of hydropower installed capacity, often use “to ensure that the output ratio method”, “the number of hours of use” or “compensation method” and so on. This paper attempts to “maximum economic efficiency” as the main indicator of the analytical methods to choose a reasonable adjustment of the optimal installed capacity of small hydropower stations for reference. In order to make the installed capacity reasonable and the power station reach the maximum economic benefit, we must first analyze the factors that affect the economic benefits of the power station. Investment in power plant construction is the first factor that affects the economic benefits of power plants. It is closely related to the installed capacity