在华主席、党中央抓纲治国战略决策指引下,我矿西山采矿场,认真贯彻“采掘并举,掘进先行”方针,发动群众,精心准备,于1978年5月5日至6月4日,组织了吊罐法独头掘进斜天井的会战,夺得了31天进尺435.7米的优异成绩,平均日进尺14.05米(最高24米),直接工效1.30米/工班,创造了全国化工矿山吊罐天井独头月进最高纪录,达到了国内先进水平。一、基本情况会战在我矿西山采矿场-230米中段进
Under the guidance of China’s President and the Party’s Central Government’s strategic decision to govern and administer the country, the mine’s Xishan Mine’s mining site has earnestly implemented the “piping and excavation, excavation first” policy, mobilized the masses, and prepared meticulously, from May 5 to June 4, 1978. Organized the hanging tank method to dig into the slanting courtyard and won a 31-day footage of 435.7 meters. The average daily footage was 14.05 meters (up to 24 meters) and the direct ergonomics was 1.30 meters per class, creating a national chemical mine hanging tank. Patio tops the highest monthly record and reached the domestic advanced level. First, the basic situation of the battle in the mine in Xishan mine - 230 meters into the middle