甌江工程是一个发电容量100多万瓩的大型水电站.垻高140公尺,垻址地質上最大特点是河床中有厚55公尺以上的砂卵石冲积层、从初步勘探成果了解,在砂卵石层中,部分地区发现有粘土夹层.此工程为大跃进中新增项目之一,要求争取1961年发电,保証1962年发电.工程的勘测、設計,施工均自1958年7月才开始.这个工程的垻型比较工作中,曾有过两种不同意见的争论:一种意见认为不应做当地材料垻,应做混凝土垻.持有这种意见的是一些负责工程师,其理由为:
The Lancang River Project is a large-scale hydropower station with a power generation capacity of more than 100 million tons. The elevation is 140 meters. The geological feature of the site is the sand-pebble alluvium that is more than 55 meters thick in the river bed. It is known from preliminary exploration results that the In the pebble layer, clay interlayers were found in some areas. This project was one of the new projects in the Great Leap Forward and required the generation of power generation in 1961 to ensure the power generation in 1962. The survey, design and construction of the project started only in July 1958. There have been two different arguments in this project’s comparative work: one opinion is that local materials should not be used and concrete work should be done. Some engineers responsible for this opinion are: